·
Ensure that the voltage and frequency of your power source match
the voltage and frequency inscribed on the electrical rating label of the
equipment.
·
Do not install the system in or near a plenum, air duct, radiator, or
heat register.
·
Never use the product in a wet location.
Equipment Chassis
·
Do not block or cover the openings to the system.
·
Never push objects of any kind through openings in the equipment.
Dangerous voltages might be present.
·
Conductive foreign objects can produce a short circuit and cause fire,
electric shock, or damage to your equipment.
·
Lift equipment using both hands and with your knees bent.
Equipment Racks
To avoid injury or damage to the equipment:
·
Observe local occupational health and safety requirements and
guidelines for manual materials handling.
·
Do not attempt to move a rack by yourself; a minimum of two people
are needed to move a rack.
·
Do not attempt to move a fully loaded rack. Remove equipment from
the rack before moving it.
·
Do not attempt to move a rack on an incline that is greater than 10
degrees from the horizontal.
·
Make sure the rack is properly secured to the floor or ceiling.
·
Make sure the stabilizing feet are attached to the rack if it is a
single-rack installation.
·
Make sure racks are coupled together if it is a multiple-rack
installation.
·
Make sure the rack is level and stable before installing an appliance
in the rack.
·
Make sure the leveling jacks are extended to the floor.
·
Make sure the full weight of the rack rests on the leveling jacks.
Summary of Contents for TYAN B8026G62FE10HR
Page 1: ...GT62F B8026 Service Engineer s Manual ...
Page 27: ...1 3 4 Internal View B8026G62FE10HR B8026G62FV10HR LE ...
Page 32: ...2 1 2 Removing the Air Duct 1 Remove the air duct from the chassis ...
Page 37: ...DIMM Location ...
Page 42: ...4 Insert the PCI E card in the direction of arrows as shown ...
Page 43: ...5 Screw the PCI E cards firmly to the riser card bracket ...
Page 48: ...http www tyan com 48 3 Secure the mounting ears of chassis to the rack with 2 M5 15L C screws ...
Page 55: ...http www tyan com 55 7 Remove the eight screws securing the bracket to the HDD backplane ...
Page 85: ...http www tyan com 85 4 3 1 1 CPU0 Information ...
Page 93: ...http www tyan com 93 ...
Page 109: ...http www tyan com 109 4 3 11 NVMe Configuration ...
Page 110: ...http www tyan com 110 4 3 12 SATA Configuration ...
Page 116: ...http www tyan com 116 4 4 1 2 Socket 0 Information ...
Page 118: ...http www tyan com 118 4 5 AMD CBS Menu ...
Page 120: ...http www tyan com 120 4 5 1 1 Core Thread Enablement Submenu ...
Page 123: ...http www tyan com 123 4 5 3 UMC Common Options Submenu ...
Page 124: ...http www tyan com 124 4 5 3 1 DDR4 Common Options Submenu ...
Page 131: ...http www tyan com 131 4 5 4 FCH Common Options Submenu ...
Page 136: ...http www tyan com 136 4 6 2 BMC Network Configuration Submenu ...
Page 154: ...http www tyan com 154 7 Insert the LAN card into the OCP slot ...
Page 155: ...http www tyan com 155 8 Secure the LAN card to the chassis ...
Page 159: ...http www tyan com 159 NOTE ...