19
Chapter 7: Site Commissioning
Enable the RTU for alarm call-outs by calling Technical Support.
Setup Forms
Ensure setup forms have been submitted to [email protected]. Verify proper
labeling on your web portal and the wiring diagram on the Mission RTU. Users with
Superadmin or Admin credentials have the ability to make changes to the web portal.
Documentation and Help Guides
It is recommended that you review the online manuals for detailed operation of your RTU
and web portals. This can be found on your menu selection in the Download folder under
Documents.
The Operators Guide that came with the RTU should be distributed to your operators as
a how-to document to get operators started with the Mission system. It covers the basics
of the system capabilities, monitoring and alarming, and helpful resources.
Training Resources
Mission hosts weekly webinars nearly every Wednesday at 2 P.M. Eastern. The
revolving series covers the basics, advanced web portal options, and everything in
between. Mission wants to help you get the most out of your system, so please join and
feel free to ask questions.
Mission also offers short video tutorials and quarterly newsletters with timeless
information. Registration and archives can be found on the website.
Your unit is now ready for use. Visit 123scada.com and log in with your credentials to
view your web portal or go to 123mc.com to use the legacy web portal.