Installation and Programming Manual
Mircom Technologies Inc
All Rights Reserved
LT-1034 Rev.1
Page 40 of 54
5.24 Setting the NMC General Alarm Relay Operation
Access Level 3
Use this menu selection to enable [default] or disable the General Alarm Relay Operation.
If the General Alarm Relay Operation is disabled, the General Alarm relay will
NOT
activate during an alarm
condition.
Select [
CONFIGURE
]
[
CONFIGURE NMC
]
[
CONFIG
RELAYS
Press
NXT
to toggle between options (Enabled/Disabled). Press
ENT
to accept option.
5.25 NMC Tests
The Relay Test allows for testing of the Trouble and Alarm Relays. When selected to ON, both relays will
REVERSE STATUS. When selected to OFF, the relays will return to NORMAL stat.
5.26 Testing the NMC Alarm and Trouble Relays
Access Level 2
Use this menu selection to test the NMC Alarm and Trouble Relays. ON will energize both relays and OFF will de-
energize both relays.
Select: [
TEST
]
[
NMC TEST
]
[
TEST RELAYS
].
Press
ON
to energize and
OFF
to de-energize.
5.27 Testing the NMC LEDs, LCD Display and Piezo (Lamp Test)
To test the NMC LEDs, LCD display and Piezo, press
and simultaneously on the NMC
Keypad. All LEDs will turn on, each line of the LCD display will be black and the piezo will be on.
*
shift
RELAY TEST
RELAYS… ON
ON OFF BCK
TEST LAMP/PIEZO
>TEST RELAYS
UP DWN ENT BCK
>NMC TESTS
ISD TESTS
UP DWN ENT BCK
DISPLAY VERSION
ADMIN
>TESTS
UP DWN ENT BCK
ALARM
RELAY: ENABLED
NXT ENT BCK
NMC NETWORK
SYST PARAMETERS
>CONFIG RELAY
UP DWN ENT BCK
>CONFIGURE NMC
CONFIGURE ISD
UP DWN ENT BCK
ADMINISTRATION
TEST
>CONFIGURE
UP DWN ENT BCK
DATE/TIME LOSS
TROUBLE: ENABLED
NXT ENT BCK
#
space
Summary of Contents for Fire-Link ISD-1000 Series
Page 2: ......