18
1079321-W2-G
The unit
must not
be run dry. Before proceeding any further with the installation the
shower unit must be commissioned.
1.
of the shower unit.
Caution!
Do not over tighten.
2.
Turn on the water supplies and check
for leaks.
3.
Switch on the electrical supply.
4.
Tu r n t h e o u t e r f l o w c o n t r o l
anticlockwise
5.
Rotate the inner temperature control
anticlockwise to check the hot supply
and clockwise to check the cold
supply.
6.
clockwise
to the
OFF
position.
7.
T h e s h o w e r u n i t i s n o w
commissioned.
Hose Washer
Hose
Outer Flow Control
Maximum
Flow Position
Outer Flow Control
OFF Position
Inner Temperature
Control
Temperature Indicator
Cooler
Warmer
Connect the flexible hose to the outlet
to full flow.
Turn the flow control
COMMISSIONING
Summary of Contents for 1.1532.327
Page 30: ...30 1079321 W2 G NOTES...
Page 31: ...31 1079321 W2 G NOTES...