17
1079321-W2-G
19.
the three cover securing screws.
20.
position.
21.
Insert the temperature indicator trim
and the inner temperature control
knob.
22.
The power thermostatic shower will
now require commissioning, refer to
COMMISSIONING
.
23.
instruction manual supplied with the
Refit the unit cover and secure with
Insert the flow control knob in the OFF
Install the shower fittings, refer to the
fittings.
OFF Position
Temperature
Control Knob
Temperature
Indicator Trim
Arrow / OFF
Position
Inner
Temperature
Control Knob
Summary of Contents for 1.1532.327
Page 30: ...30 1079321 W2 G NOTES...
Page 31: ...31 1079321 W2 G NOTES...