background image

European Standard EN 1090

Since July 2014, load-bearing parts made of steel have required EN 1090 certiication to obtain general 

technical approval.

The standard applies in he following countries:

Belgium, Bulgaria, Denmark, Germany, Estonia, Finland, France, Greece, Ireland, Iceland, Italy, Croatia, 

Latvia, Lihuania, Luxembourg, Malta, he Neherlands, Norway, Austria, Poland, Portugal, Romania, 

Sweden, Switzerland, Slovakia, Slovenia, Spain, he Czech Republic, Hungary, he United Kingdom and 

Cyprus

Summary of Contents for PR 6144 Series

Page 1: ...144 Installation Manual Translation of the Original Installation Manual 9499 053 64400 Edition 7 3 0 11 06 2019 Minebea Intec GmbH Meiendorfer Str 205 A 22145 Hamburg Germany Phone 49 40 67960 303 Fax...

Page 2: ...iied personnel In correspondence concerning this product the type name and release number serial number as well as all license numbers relating to the product have to be cited Note This document is pa...

Page 3: ...ell arrangement 6 3 2 Internal lift of protection 7 3 3 Stops 7 4 Speciications 8 4 1 Equipment supplied 8 4 1 1 SeismicMount PR 6144 54 15 35 8 4 1 2 SeismicMount PR 6144 55 9 4 2 Dimensions 10 4 2 1...

Page 4: ...8 2 Accessories 19 8 2 1 Load discs 19 9 Certiicates 20 SeismicMount PR 6144 Table of contents EN 2 Minebea Intec...

Page 5: ...volved when measures for preventing hazards are not followed DANGER Warning of personal injury DANGER indicates death or severe irreversible personal injury which will occur if the corresponding safet...

Page 6: ...d or the environment may occur if appropriate safety measures are not observed Take the corresponding safety precautions Note User tips useful information and notes 1 6 Hotline Phone 49 40 67960 444 F...

Page 7: ...allation turning over or being shifted thus eliminating danger to people animals or goods even in the case of a break in a load cell or mounting element Installation and repair work must only be carri...

Page 8: ...3 Recommendations for installation 3 1 Load cell arrangement Examples 120 SeismicMount PR 6144 3 Recommendations for installation EN 6 Minebea Intec...

Page 9: ...t of protection and distance B Type D B PR 6144 54 50 mm 0 5 to 1 5 mm PR 6144 15 50 mm 0 5 to 1 5 mm PR 6144 35 56 mm 0 5 to 1 5 mm PR 6144 55 56 mm 0 5 to 1 5 mm 3 3 Stops The stops must be adjusted...

Page 10: ...Screw 4 2 Nut 4 3 Upper plate 4 Screw 2 5 Spring washer 2 6 Washer 2 for the equipotential bonding cable 7 Nut 12 8 Washer 4 9 Threaded rod with marking to check the screw in depth 4 10 Lower plate 11...

Page 11: ...e 4 Screw 2 5 Spring washer 2 6 Washer 2 for the equipotential bonding cable supplied with load disc kit PR 6143 55 7 Nut 12 8 Washer 4 9 Threaded rod with marking to check the screw in depth 4 10 Low...

Page 12: ...d PR6144 55 only 3 Hole pattern in the lower plate Mounting kit a b c d e f g h j k l PR 6144 54 820 240 740 160 160 33 380 240 300 160 33 PR 6144 15 950 310 870 190 220 33 400 310 315 220 33 PR 6144...

Page 13: ...is completely screwed in Mounting kit m n o p q r s t u PR 6144 54 217 350 620 30 30 25 80 M30 120 PR 6144 15 298 435 740 35 35 25 80 M30 140 PR 6144 35 387 545 920 40 40 30 100 M36 150 PR 6144 55 428...

Page 14: ...1200 kN Perm lifting force max 400 kN max 600 kN max 880 kN max 880 kN Lifting destructive force 600 kN 900 kN 1200 kN 1200 kN Perm vertical load without LC dummy function max 16 t max 24 t max 60 t m...

Page 15: ...for vibration dampening or for temperature insulation a load compensating plate must be provided between this soft iller layer and the mounting kit to ensure even load application into the mounting ki...

Page 16: ...ounding clamp of the welding set is itted as closely as possible to the welding joint 5 3 2 Installing the mounting kit Note When welding the upper and lower plates always observe the weld speciicatio...

Page 17: ...2 2 Position the lower plate 7 with the dummy 6 on the foundation Ensure that the upper and lower plates are parallel and seated vertically above each other 3 Carefully place the vessel on the lower p...

Page 18: ...hermal expansion vibration etc can be utilized without reducing the measuring accuracy only if the load cell has been installed exactly To avoid force shunts all incoming and outgoing lines hoses pipe...

Page 19: ...from top to bottom and around the mounting kit NOTICE Some cleaning agents may not be compatible with the mounting kit material When using cleaning agents ensure that their compatibility with the mou...

Page 20: ...ther unsorted municipal waste so that it can then be recycled Before disposing of or scrapping the product any batteries should be removed and taken to a suitable collection point Please see our T Cs...

Page 21: ...sc 200 t 300 t 5322 520 10553 8 2 Accessories 8 2 1 Load discs To install the load cell the following load discs are recommended No Description Max capacity Order no 1 Load disc kit PR 6143 55N 520 t...

Page 22: ...Description Document no 1 CE marking CE PR 6144 2 Declaration of Performance 003 2019 3 Conformity of the Factory Produc tion Control 2451 CPR EN1090 2014 2089 004 SeismicMount PR 6144 9 Certiicates...

Page 23: ...al approval The standard applies in he following countries Belgium Bulgaria Denmark Germany Estonia Finland France Greece Ireland Iceland Italy Croatia Latvia Lihuania Luxembourg Malta he Neherlands N...

Page 24: ...5 Hamburg Germany 5 System to evaluate and check the constancy of performance of the building product in accordance with Annex V System 2 6 The notified location DVS ZERT GmbH has carried out the firs...

Page 25: ...1 and EN1090 2 execution class EXC2 8 The performance of the product in accordance with numbers 1 and 2 corresponds to the performance declaration in number 7 The manufacturer in accordance with numbe...

Page 26: ......

Page 27: ......

Page 28: ...Published by Minebea Intec GmbH Meiendorfer Strasse 205 A 22145 Hamburg Germany Phone 49 40 67960 303 Email info minebea intec com www minebea intec com...

Reviews: