3
10
9
7
11
5
12
2
Note:
Only for PR 6144/55 (Max. capacity 520 t):
The PR 6143/55 load disc kit must be ordered separately; for order no. see Chapter
5.4 Check mounting
When all mounting kits have been installed, check them for proper mounting.
In particular, force shunts should be avoided.
It is essential to check:
-
whether the load cell has been inserted in the mounting kit vertically and without
being canted.
-
whether the upper and lower plates are mounted in a horizontal position.
-
whether free moving space and the required play for thermal expansion are provided.
The free moving space which is required for displacement of the measured object due to
thermal expansion, vibration, etc. can be utilized without reducing the measuring
accuracy only if the load cell has been installed exactly.
To avoid force shunts, all incoming and outgoing lines (hoses, pipes, cables) must be
connected to the measured object with the greatest lexibility possible.
The entire load must be supported by the load cells!
9. Clean the load cell base on the plate of the lower plate (7) and the recess (3) for the
upper load disc (9) in the upper plate (2).
10. Insert the load cell (11) with the load discs vertically into the mounting kit.
11. Lower the vessel slowly and make sure that the upper load disc (9) in the recess (3) is
not canted (check using the borehole [10]).
12. Adjust the lift-of protection devices (12) (4×) as described in Chapter
.
13. Adjust the stops (5) (4×) as described in Chapter
SeismicMount PR 6144
5 Installation
EN-16
Minebea Intec