Procedure:
Example: PR 6012/32
1.
Fit the mounting kit to the vessel foot (1). It is essential to observe the property
classes and tightening torques of the screws (2) and the property classes of the
washers (3) (refer to Chapter
).
2.
Carefully position the vessel with mounting kit on the foundation/substructure (8)
using the mounting drill holes.
3.
Fasten the lower plate (9) to the foundation/substructure (8) and make sure that the
plates are in parallel and seated vertically above each other. It is essential to observe
the property classes and tightening torques of the screws (2) and the property classes
of the washers (3) (refer to Chapter
).
Maxi FLEX and Maxi FLEXLOCK mounting kits PR 6012/02, ../32, ../42
5 Installation
EN-22
Minebea Intec