![Minebea Intec IS16EDE-H Installation And Operating Instructions Manual Download Page 7](http://html.mh-extra.com/html/minebea-intec/is16ede-h/is16ede-h_installation-and-operating-instructions-manual_1801139007.webp)
Installation and Operating Instructions IS16/34/64EDE
7
Getting Started
7
Separate Power Connection (Optional) for the Weighing Platform
An adapter kit must be installed by a Sartorius dealer or service technician to
connect the weighing platform separately to line current (mains supply). In
addition, this separate power connection is required if you interface the
weighing platform directly with a computer.
The following diagrams show the options for powering weighing platforms
and display and control units:
Connecting the industrial-grade ING2 AC adapter to the Sartorius isi
industrial terminal without an extension cord:
Connecting the industrial-grade ING2 AC adapter only to the isi industrial
terminal with an extension cord:
Connections using cables longer than 12 m (~40 ft):
max 3 m
max 3 m
Getting Started
3 m
6 m
300 m max.
Summary of Contents for IS16EDE-H
Page 20: ...20 Installation and Operating Instructions IS16 34 64EDE Declaration of Conformity 1 6 ...
Page 21: ...Installation and Operating Instructions IS16 34 64EDE 21 Declaration of Conformity 2 6 ...
Page 27: ...Installation and Operating Instructions IS16 34 64EDE 27 Certificate ...
Page 29: ...Installation and Operating Instructions IS16 34 64EDE 29 Certificate ...
Page 30: ...30 Installation and Operating Instructions IS16 34 64EDE Plates and Markings 26 ...
Page 31: ...Installation and Operating Instructions IS16 34 64EDE 31 Plates and Marking 27 ...
Page 33: ...Installation and Operating Instructions IS16 34 64EDE 33 Plates and Marking PPIS030511e ...
Page 39: ...Installation and Operating Instructions IS16 34 64EDE 39 ...