![Minebea Intec CAIS3 Service Manual Download Page 59](http://html.mh-extra.com/html/minebea-intec/cais3/cais3_service-manual_1801133059.webp)
58
Service Manual Combics
Opening Combics Indicators
Important note!
3
An insulating transformer must be installed upstream when working on an
opened Combics indicator under power.
t
Ten nuts (see left image) must be removed to open the Combics indicator.
Replacing the Seal
Important!
h
After carrying out any repair, the seal between the front plate and the housing
must be checked visually for damage and replaced if necessary.
After closing, a special test procedure is used to check the degree of protection
for devices that guarantee an IP degree of protection.
t
Replace a defective seal.
y
The seal must be seated properly and should not be cracked.
Repairs for Combics Indicators
Summary of Contents for CAIS3
Page 82: ...81 Service Manual Combics ...
Page 100: ...99 Service Manual Combics Adjustment data ...
Page 102: ...101 Service Manual Combics ...