This Section....
... describes the setup operations required to connect the unit to a PC after unpacking it.
Installation .............................................. 1-2
Installing the Optional Blower Unit ...........1-2
Names and Functions of Parts ............... 1-3
Main Unit ..................................................1-3
Electrical Box ............................................1-4
Head .........................................................1-5
Cable Connections ............................... 1-10
Turning the Power ON/OFF.................. 1-11
Emergency Stop ................................... 1-12
Applying an Emergency Stop .................1-12
Resetting an Emergency Stop ................1-12
Compressed Air Connection................. 1-13
Checking the Compressed Air Pressure 1-13
Dust Collector Connections .................. 1-14
Precautions for Dust Collector
Connections ...........................................1-14
Connecting the Dust Collector ................1-15
Preparing the Cutting Panel ................. 1-16
Attach the felt mat (Models R1, M). ........1-16
Inserting the Work Guide Plates .............1-16
Blades and Workpieces........................ 1-17
Mounting Tools ..................................... 1-18
Mounting the Pen or Swivel Blade ..........1-19
Mounting the Tangential Cutter ..............1-22
Mounting the Grid Roller .........................1-24
Mounting the Reciprocating Cutter .........1-25
Mounting the Milling Tool ........................1-27
Local Status / Remote Status ............... 1-32
Local Status and Displays ......................1-32
Remote Status and Displays ..................1-33
Matching the PC Specifications............ 1-34
Setting the Communication Conditions ..1-34
Enabling PC Commands (CMD SW) ......1-36
Setting the Effective Area Return Values
(OH UNIT) ..............................................1-37
Setting the Command Origin ..................1-38
Resolution (GDP ) Setting ......................1-39
Matching the Plotter Specifications ...... 1-40
Setting Automatic Head Retraction ...... 1-41
Setting the Vacuum .............................. 1-42
Enabling / Disabling the Vacuum
Automatic OFF Function .........................1-42
Chapter 1
Setup
Summary of Contents for CF3-1610
Page 7: ...vi ...
Page 110: ...3 20 ...
Page 124: ...4 14 ...
Page 164: ...6 30 ...
Page 165: ...D201768 14 29062009 ...
Page 166: ...NH FW 3 30 Printed in Japan MIMAKI ENGINEERING CO LTD 2009 ...