14
PAGE
4939 5258 01
Assembly
Mounting the
anti-vibration
mechanism
and the field
1
Insert the field (6) into the motor hous-
ing (8) and fix it with two screws (7)
(torque = 2 Nm).
2
Insert the following parts of the anti-
vibration mechanism into the motor
housing (8):
– transition piece (3)
– spring (2)
– thrust piece (1).
3
Fix the anti-vibration mechanism with the
screw (4) (torque = 3 Nm).
4
Insert the air deflector ring (5) into the
motor housing (8). Mind the right position!
Assembling
the electronic
component
1
Mount the following parts:
– secured washer (9)
– four screws (8)
(torque = 4 Nm)
– electronic part (E)
– two carbon brush holders (B)
☞
Insert the end of the flat spiral
spring (G) into the slot (H) in the pin of
the carbon brush holder as indicated in
the enlargement of the figure (mean-
ing: hook the flat spiral spring (G) into
the pin in the “11 o’clock” position!).
Tension the flat spiral spring by 1 turn
in clockwise direction.
Afterwards position the other spring
end (I) onto the carbon brush holder
(“ready position”).
– two screws (A)
(torque = 1.3 Nm)
– two wires (D)
– four O-rings (C).
☞
Take care that no wires are jammed or
squeezed.
☞
All wires must be correctly inserted
between the cable entry lugs
(see pictures on page 15).
2
Insert the switch (3) into the handle
half (F).
3
Insert the mains cable (7) and fix the
strain relief (6) with the screw (5)
(torque = 1.3 Nm).
4
Connect the mains cable (7) with the
switch (3) and with two screws (4)
(torque = 0.5 Nm).
5
Mount the handle half (2) and fix the han-
dle with four screws (1) (torque = 3 Nm).
f
d
e
c
1
2
3
4
5 6
7
8
1
b
a
f
a
c
b
d
h
e
3
4
5
6
D
8
9
A
B
C
E
7
1
2
F
G
H
I
2