Preventive Maintenance
PELLERIN MILNOR CORPORATION
3.
Preventive Maintenance
Table 1: Preventive Maintenance Checklist
Components
Action
Frequency
Specifications/References/Figures
Main Bearing
Housing
Bearings
Slowly grease, 2
strokes - 0.12 fluid
ounces (3.54 grams) at
two locations.
Monthly
Water seals
Slowly grease, 1
stroke - 0.06 fluid
ounces (1.77 grams) at
one location.
Monthly
Shell Alvania EP (or equivalent). See
"Bearing Housing Maintenance
Points."
Drive Train
Drive belts
Inspect belt(s) and
pulley for wear. Test
belt tension.
Every four
months
See "Drive Belt Service and Service
Notes" in this section.
Inverter fans and
vents
Verify fan operation
and vacuum out vents.
Monthly
See "Drive Train Maintenance
Points."
Suspension
Rubber springs
Inspect for cracks and
deterioration.
Monthly
See "Suspension Maintenance
Points."
Ball bushings
Slowly grease, 1
stroke - 0.06 fluid
ounces (1.77 grams) at
one location.
Every two
months
Shell Alvania EP (or equivalent). See
"Suspension Maintenance Points."
Shocks
Inspect for leaks and
deterioration.
Every four
months
See "Suspension Maintenance
Points."
Foundation
Bolts
Check bolts for
tightness and wear.
Tighten or replace as
necessary.
Every four
months
Dimensional drawings
Chemical Supply
(if so equipped)
Supply hoses
Inspect for leaks and
deterioration, observe
operation.
Every four
months
Flushing supply
injection valve
strainers (if so
equipped)
Inspect and clean the
strainers in supply
injector valves and
clean out each
compartment.
See "Service Notes" in this section
Steam
Steam strainer (if so
equipped)
Inspect and clean
strainer
Every four
months
4.
Drive Belt Service
Check tension for a new belt according to the following schedule and tighten belt if needed, as
described below.
• After 24 hours operation (three eight-hour shifts)
• After 80 hours operation (ten eight-hour shifts)
• After 160 hours operation (twenty eight-hour shifts)
Summary of Contents for 36026X8J
Page 24: ......
Page 25: ...Section 1 Service and Maintenance ...
Page 31: ......
Page 52: ......
Page 63: ...Section 2 Drive Assemblies ...
Page 65: ......
Page 69: ......
Page 73: ...Section 3 Suspension ...
Page 80: ......
Page 81: ...Section 4 Shell and Door Assemblies ...
Page 87: ...Section 5 Water and Steam Piping and Assemblies ...
Page 95: ......
Page 97: ......
Page 99: ......
Page 104: ......
Page 105: ...Section 6 Chemical Supply Assemblies ...
Page 117: ...Section 7 Control and Sensing Assemblies ...
Page 120: ......
Page 121: ...Section 8 Pneumatic Assemblies ...
Page 123: ...Section 9 Dimensional Drawings ...
Page 124: ......
Page 125: ......
Page 126: ......