1.
General
Required service connections, (depending on machine model and optional features) are as
follows:
1. Piped inlets and outlets (cold water, hot water, flush water, direct steam, liquid supply and
drain to sewer). The sizes and locations of piped inlets and outlets are shown on the
dimensional drawing for your machine.
2. Electrical power connections.
2.
Requirements for Piped Connections
Notice 1 : Machine Damage Hazards
—Valve bodies will be ruined if twisted and
distorted.
• Hold the connection side of the valve with a wrench when connecting plumbing.
1. Inlet pressures must be within the minimum/maximum range specified. Pressure outside of
the specified range may cause the machine to operate inefficiently or malfunction and may
damage machine components.
2. A separate flush water valve pressure regulator set for approximately 28 psi (193 kPa) is
shipped with the machine (Figure 1). Install this regulator on the flush water inlet when
installing piping.
3. Throughly flush all water lines before making connections.
4. We recommend installing 40 mesh strainers or filters in front of the cold, hot and third water
valves.
5. When connecting water and steam inlets, always install unions and shut off valves at the
point of connection to permit removal of the machine components for servicing, when
necessary.
Figure 1: Flush water valve pressure regulator
CAUTION 2 : Machine Damage Hazards
—Pumped chemical systems, if not properly
installed, can cause corrosion damage.
• See the reference manual for precautions and additional information before making any
chemical connections.
Summary of Contents for 36026X8J
Page 24: ......
Page 25: ...Section 1 Service and Maintenance ...
Page 31: ......
Page 52: ......
Page 63: ...Section 2 Drive Assemblies ...
Page 65: ......
Page 69: ......
Page 73: ...Section 3 Suspension ...
Page 80: ......
Page 81: ...Section 4 Shell and Door Assemblies ...
Page 87: ...Section 5 Water and Steam Piping and Assemblies ...
Page 95: ......
Page 97: ......
Page 99: ......
Page 104: ......
Page 105: ...Section 6 Chemical Supply Assemblies ...
Page 117: ...Section 7 Control and Sensing Assemblies ...
Page 120: ......
Page 121: ...Section 8 Pneumatic Assemblies ...
Page 123: ...Section 9 Dimensional Drawings ...
Page 124: ......
Page 125: ......
Page 126: ......