![Milnor 30022V8Z Service Manual Download Page 55](http://html1.mh-extra.com/html/milnor/30022v8z/30022v8z_service-manual_1797089055.webp)
R
Pellerin
Milnor
Corporation
Pellerin
Milnor
Corporation
P
.
O.
Box
400,
Kenner
,
L
A
70063-0400
Litho
in
U.S.A.
3022
V8Z
BMP100039/2010482B
(Sheet
2
o
f
3
)
Door
Installa
tion
and
Assembl
y
Section
A
Door
Glass
Installation
14
15,16
13
13
14
15,16
17
SEE
SECTION
A
Ensure
that
the
gasket
joint
line
is
at
top-dead-center
Door
Locking
Handle
(See
BMP010016)
1.
2.
3.
Apply
a
continuous
bead
of
silicone
completely
around
the
rubber
seal,
in
the
area
where
the
glass
is
to
be
seated.
Install
the
gasket
into
the
door
before
installing
the
glass.
Observe
the
location
of
the
rubber
seal
joint
line
and
adjust
if
necessary
.
While
installing
the
glass
into
the
rubber
seal,
ensure
that
no
silicone
is
exposed
on
outer
surface
of
the
rubber
seal.
51
Summary of Contents for 30022V8Z
Page 29: ...Section 1 Service and Maintenance 25 ...
Page 42: ...38 ...
Page 43: ...Section 2 Drive Assemblies 39 ...
Page 47: ...Section 3 Cylinder Shell and Bearing Assemblies 43 ...
Page 53: ...Section 4 Door Assemblies 49 ...
Page 64: ...60 ...
Page 65: ...Section 5 Chemical Supply Devices 61 ...
Page 69: ...Section 6 Water and Steam Piping and Assemblies 65 ...