![Milnor 30022V8Z Service Manual Download Page 16](http://html1.mh-extra.com/html/milnor/30022v8z/30022v8z_service-manual_1797089016.webp)
PELLERIN MILNOR CORPORATION
Display or Action
Explanation
B2T2001014: Cold water connection.
B2T2001015: Reuse (third) water connection.
B2T2001016: Flushing water connection. This is the water that
goes into the supply compartment or pumped chemical manifold
to flush chemicals into the machine.
B2T2003001: Hold the side of the connection stationary with a
wrench as you tighten the connection with another wrench.
Otherwise, you may twist components, such as valves, damaging
them.
B2T2003002: CAUTION: Equipment and Textile Damage
Hazards—Chemicals leaked into the machine, particularly when
it is idle, can destroy machine components and textiles left in the
machine.
Ensure the chemical system prevents dribbling, siphoning, or any
other unintentional release of chemicals.
Inspect regularly for proper operation and evidence of damage.
Consult Milnor document BIWUUI03 “Avoiding Damage from
Allied Remote Chemical Delivery Systems”.
B2T2004027: Steam connection (optional)
B2T2006012: Retain the motor mount spring adjustment sleeve
provided with certain machine models. This sleeve is used to
increase drive belt tension as the belt wears. Instructions are
provided in document BIRQUM01 "Preventive Maintenance" in
the service manual.
12
Summary of Contents for 30022V8Z
Page 29: ...Section 1 Service and Maintenance 25 ...
Page 42: ...38 ...
Page 43: ...Section 2 Drive Assemblies 39 ...
Page 47: ...Section 3 Cylinder Shell and Bearing Assemblies 43 ...
Page 53: ...Section 4 Door Assemblies 49 ...
Page 64: ...60 ...
Page 65: ...Section 5 Chemical Supply Devices 61 ...
Page 69: ...Section 6 Water and Steam Piping and Assemblies 65 ...