OM-4421 Page 24
5-5. Activating The Dry Charge Battery (If Applicable)
!
Always wear a face shield,
rubber gloves and protective
clothing when working on a
battery.
Remove battery from unit.
5
Vent Caps
6
Sulfuric Acid Electrolyte
(1.265 Specific Gravity)
7
Well
Fill each cell with electrolyte to
bottom
of well (maximum).
!
Do not overfill battery cells.
Wait ten minutes and check electro-
lyte level. If necessary, add electro-
lyte to raise to proper level. Reins-
tall vent caps.
8
Battery Charger
!
Read and follow all instruc-
tions supplied with battery
charger.
Charge battery for 12 minutes at 30
amperes or 30 minutes at 5 am-
peres. Disconnect charging cables
and install battery.
When electrolyte is low, add
only distilled water to cells to
maintain proper level.
1
Tools Needed:
2
4
30 A For 12 Minutes
5 A For 30 Minutes
OR
+
−
3
drybatt1 6/05
−
S-0886
5-6. Connecting The Battery
1/2 in
−
+
!
Connect negative (
−
) cable last.
Tools Needed:
Ref. 215 158 / 803 605 / S-0756-C
Reinstall cover after connecting battery.
Summary of Contents for 500 X
Page 35: ...OM 4421 Page 29 Notes ...
Page 39: ...OM 4421 Page 33 Notes ...
Page 47: ...OM 4421 Page 41 SECTION 9 MAINTENANCE TROUBLESHOOTING 9 1 Maintenance Label ...
Page 59: ...OM 4421 Page 53 Notes Welding Symbols Ref AWS ANSI A2 4 ...
Page 61: ...OM 4421 Page 55 223 522 B ...
Page 62: ...OM 4421 Page 56 Figure 10 2 Circuit Diagram For CC CV Welding Generator ...
Page 63: ...OM 4421 Page 57 223 523 B ...
Page 94: ......