![Migali C-RB24-LP Operating Instructions Manual Download Page 10](http://html1.mh-extra.com/html/migali/c-rb24-lp/c-rb24-lp_operating-instructions-manual_1793350010.webp)
- 9 -
rainproof measures should be taken.
6. Installation and Debugging
Any erroneous installation, adjustment, refit, overhaul or
maintenance may cause property damage or personal injury. All this
work shall be completed by authorized and licensed technicians,
otherwise the manufacturer has the right not to provide warranty
service;
Only be installed in accordance with the local code. If no similar
standard, you should conform to the National Fuel Gas Code, ANSI
Z223.1/NFPA 54, the National Gas Installation Code, CSA-B149.1, or the
L.P. Gas Installation Code, CSA-B149.2 as applicable;
The appliance individual shutoff valve must be disconnected from
the gas supply piping system during any pressure testing of that system
at test pressures in excess of 1/2psi (3.45kPa).
6.1
、
Unpacking and Installation
Please dispose of all packaging materials and residues after unpacking;
Check the equipment. If it is damaged, please keep wrappers and
receipts, which must be signed by the carrier representative (Driver), and
contact the carriers to pursue a claim within 15 days after receiving;
Check all accessories complete. Refer to P17 table 5;