Rear view
a
Protruding lid for holding when
moving the dryer (see arrows)
b
Air inlet vent for cooling the
condenser unit
c
Mains connection cable
d
Hose for external drainage of
condensed water
e
Accessories for connection to a sink
drain outlet
Installation site
,
Make sure the dryer door can be
opened without hindrance after in-
stallation.
Transporting the dryer to its
installation site
When moving the dryer, hold it by the
lid where it protrudes to the rear. To
manoeuvre the dryer out of its packing
case to its installation site hold it by the
front feet and the base of the lid
.
Building under a continous worktop /
in a kitchen run
,
A
building-under kit
* with a
coverplate to replace the appliance
lid is required. It must be fitted by a
suitably qualified person to ensure
electrical safety.
N.B. If you wish to push your appliance
under a worktop and there is space to
do this without removing the lid the
building-under kit is not necessary.
Otherwise it is essential.
– The building-under kit is supplied
with its own installation instructions.
– N.B. When built-under drying times
may be longer.
– The electrical socket must be
located in an accessible position
near the appliance.
With niche heights of:
– 830-840 mm, longer screw feet* are
required.
– 870-885 / 915-930 mm, one or two
raising kits* are required.
* Miele accessory available to order
Replacing the lid
If the lid has been removed in order to
fit a coverplate, ensure that, if the lid is
ever replaced, it fits securely into the
rear holders. Otherwise, it is not
properly secure for transport.
Installation
42
Summary of Contents for T 8822 C
Page 63: ...63 ...
Page 64: ...M Nr 07 847 520 05 Alteration rights reserved 0113 ...