Installation
64
Water connection
Water connec-
tions
1
2
1
3
4
a
Cold water
b
Hot water
c
Hard water/cold water
d
Cold water for liquid dispensing
The connection to the supply line established in accordance with
DIN 1988 must be made via a water shut-off valve. This installation
may only be carried out by an authorised installation technician in ac-
cordance with local and national regulations.
- DVGW (Germany)
- ÖVGW (Austria)
- SVGW (Switzerland)
- Regulations set out by the responsible water supplier or regional
building regulations.
Connection to the
water inlet/drain-
age
See the installation plan provided.
Water pressure (flow pressure) of a minimum of 100 kPa (1 bar)/max-
imum of 1000 kPa (10 bar) is required to guarantee problem-free pro-
gramme operation.
The machine must be connected to the water supply using the inlet
hoses provided.