To facilitate any future maintenance work, a maintenance corridor with a width of at least
500 mm must be set up behind the machine and must be accessible at all times. The
distance between the machine and any walls must not fall below the specified minimum
values.
Adjust the heat-pump dryer screw feet until the machine is level. After the machine has
been aligned, screw the washers tightly to the base plate using a screwdriver.
Tip:
Use a spirit level to ensure correct alignment.
Securing the machine
The tumble dryer must be secured to the floor by fitting the tensioning strips supplied
over the machine feet.
Fittings supplied are for bolting the machine to a concrete floor. For other types of floor-
ing, please purchase suitable fastening materials separately.
If the heat-pump unit is tilted up to a maximum of 30° during transportation, it must be left
to stand for at least one hour after it has been installed before the heat-pump dryer can be
operated.
If the heat-pump unit was tilted by an angle exceeding 30° or if it was subjected to strong
vibrations, the machine must be left to stand for 24 hours before commissioning.
After transportation and installation, downtime of at least one hour is required before
connecting the tumble dryer to the electricity supply.
Insufficient downtime before commissioning can damage the heat-pump.
Summary of Contents for PT 8257 WP
Page 49: ...en Dimensions 49 PT 8257 WP PT 8337 WP ...
Page 103: ...nl Afmetingen 103 PT 8257 WP PT 8337 WP ...
Page 107: ......