Installation
*INSTALLATION*
27
Aligning the installation niche
The building-in niche must be carefully
aligned using a spirit level before the re-
frigeration appliance is installed. The
niche corners must be at 90° angles to
each other, otherwise the cabinet front
will not sit straight on all 4 corners of
the building-in niche.
Checking the installation space
Check the installation dimensions.
Check the position of the electrical
and plumbing connections.
Check that all adjacent cabinets /
units are securely fixed to the wall.
Check the adjacent cabinets / units
for possible collisions when opening
doors (door opening angle).
Summary of Contents for KF 2981 Vi
Page 134: ......