98 Installation
4. Refrigerant pipe installation
4.1 Basic requirements
4.1.1
Operation procedure
4.1.2
Three principles for refrigerant piping
Principle
Reasons
Countermeasure
Dry
Rainwater/Engineered water /
Condensation may enter the piping
system
The process of tubing must follow standard procedures
→ Blow
cleanly
→ Vacuum
Clean
Oxidation produced by welding/Outside
dust /Sundries
Charge nitrogen gas to prevent oxidation when welding/Attention the
cleanness during the piping process
→ Blow clean
Air seal
Imprecision welding/Unqualified airproof
to bell-mouth/Leakage of the fringe
Use suitable welding rod to weld/Comply with welding operation
criteria/Comply with bell-mouth connecting operation criteria/Comply
with the interface operation criteria
→Air seal test
Caution:
Removing oil from copper pipe of a system that uses R410A
For the system that uses R410A, oil-free copper pipes should be selected (they can also be customized). If ordinary (oily) copper
pipes are used, it must be cleaned with gauze that is dipped into tetrachloroethylene solution.
Purpose of cleaning copper pipe: Remove the lubrication (industrial oil used during the processing of the copper pipe) attached to
the inner wall of the copper pipe. The ingredients of such lubricants are different from those of the lubricants used by the R410A
refrigerant, and will leave deposits in the system, which may cause complex system errors.
Special Note:
Never use CCl4 for pipe cleansing and flushing, or the system will be seriously damaged.
4.1.3
Support for refrigerant pipe
1. Fixing horizontal pipe
When the air conditioner is running, the refrigerant pipe will deform (for example, shrunk/expanded or droop).
To avoid pipe damage, use hangers or supports (see the table below for the criteria).
Pipe Diameter (mm)
Less than
Ф20
Ф20-40
Larger than
Ф40
Interval between support points (m)
1
1.5
2
In general, gas pipe and liquid pipe should be suspended in parallel, and the interval between support points
should be selected according to the diameter of the gas pipe. The temperature of the flowing refrigerant will
change according to operation and working conditions, which will result in expansion and shrinkage of the
refrigerant piping, therefore piping with thermal insulation should not be clamped tightly, in order to avoid any
rupturing of the copper piping as a result of unnecessary stress.
2. Fixing vertical piping
Fix the pipe along the wall according to the pipeline route. Round log should be used at the pipe clip to replace
thermal insulation material, “U”-shape pipe should be fixed outside the round log, and the round log should be
provided with anticorrosion treatment.
Pipe Diameter (mm)
Less than
Ф20
Ф20-40
Larger than
Ф40
Interval between support points (m)
1.5
2
8.2(2. 5)
Determine the route and size of the pipeline according to the construction drawing
Make and install brackets, hangers and supports
Make and arrange pipe accessories
→ Recharge nitrogen gas for protection
Welding
→ Pipe flushing → Air seal test → Thermal insulation → Vacuum