MCAC-PDS
Do
Do
th
Do
Ac
ins
Pl
De
ins
Use
All
ch
Si
Du
M-2013-04
not fix the i
not make s
e unbalanced
not install o
cording to th
talled.
ace rubber d
termine the
tall the insta
e bolts, cush
outside plat
oosing insta
ngle-door un
al-door unit
ndoor unit i
everal indo
d competiti
other equip
he bottom in
amping ma
installation
allation bas
hion, flat m
tes of the u
llation angl
nit installatio
installation
n the sunke
or units to be
on operation
ments on its
stallation siz
ts on the to
position, an
e at the selec
at and nuts
nit should no
es and fixed
n basing si
basing size:
Mide
n place or a
e huddled t
.
upper part,
ze of the in
p of the inst
d according
cted positio
to fix the air
ot allow bea
holes.
ze: (Unit: m
: (Unit: mm)
a Precision AC
t the end of
ogether, to
convenient
door unit, the
allation bas
to the site c
n.
conditioner
ring weight,
m)
Technical Ma
the long and
avoid crossin
for its norma
e installatio
e and steel p
condition an
on the base
it must be c
anual-Down D
d narrow ro
ng the air a
al maintena
n base shou
plate botto
d user’s req
e.
considered
elivery Series
43
om.
nd producing
nce.
ld be
m.
uierments to
when
3
g
o