MCAC-PDS
Di
1.
2.
3.
4.
5.
6.
Cl
1.
2.
3.
4.
7.6 Electr
Check
accord
combi
no hea
7.7 Refri
It mus
functio
corres
main
should
every
Each
M-2013-04
remove all
sassembling
Press the
Close the
cap.
Take down
Break off t
Loosen the
According
humidifica
ean the hum
Take down
screws of
Take off th
humidifica
Place the
loose, and
After clean
the connec
ical heatin
the rust sit
ing to the
nation has ta
ting effect, t
geration sy
t monthly c
n is norma
ponding erro
measure to p
not rely on
six months, m
system is eq
l the impurit
g the humidi
Manual dr
unit, and s
n the steam
the electrica
e fastening
to the reve
tion.
midification t
n the humid
the clamp i
he fixed cla
tion tank.
humidificati
d wash awa
ning, install
cting clamp
ng compo
tuation of
situation fo
andem con
then it shoul
ystem
heck the c
al and has
ors before t
prevent mos
the ceiling,
make sure
quipped wit
ies and rins
fication tank
ainage
butto
witch off the p
pipe from t
l wirings fro
devices of
erse order
ank
ification tan
n the middle
mp, and ver
on tank co
y all the sca
the humidifi
.
onents
electrical he
or replacem
nect two te
d check whe
omponents
any sign o
he compon
t system fai
floor and fi
whether the
h a liquid
Mide
e off.
k
on to empty
power supp
op of the hu
m the top o
humidificatio
of above ste
k, and use
e of humidifi
rtically take
re body into
les carefull
cation tank
ating comp
ment. The i
mperature s
ether the te
of the refri
of wear or
ents fail or
lures. Refri
ixed frame
y were worn
sight glass
a Precision AC
the water in
le for safety
midification
f the humidi
on tank, the
eps to insta
cross-screw
cation tank.
out the hum
acetum wit
y by a soft ha
core back t
onents, an
nternal circ
witches. Wh
mperature s
geration sy
not. For i
devices da
gerant pipe
vibration pla
or the exist
for observi
Technical Ma
humidifica
operation. O
tank.
fication tank
n lift it and ta
ll a new hu
driver to scr
midification
th 20% dens
airbrush.
o the humidi
d use iron b
uit of the
en there is
witches hav
stem, to vie
t was ofte
mage, so re
must have th
ace. Check
ed fixing stru
ng liquid re
anual-Down D
tion tank.
Open and ta
k.
ake it down.
midification
rew open th
tank core b
sity, waiting
fication tank
brush for d
electric hea
heating dem
ve been rese
ew whether
n accompa
egular insp
he suitable
the refriger
ucture has l
frigerant flo
elivery Series
85
ake down the
tank on the
e connecting
ody from the
for scale to
k, and fasten
e-rusting, o
ting interna
mand but has
et.
the system
nied by the
ection is the
bracket, and
ants pipeline
oosen or no
w and wate
5
e
e
g
e
o
n
or
al
s
m
e
e
d
e
ot.
er