background image

24

 

 

8. Appendix 

 

 

Technical & quality requirements for Built-in gas hob

 

 

a)

 

Use of natural gas burner    when the burner works 10 minutes in rated power

turn it to little fire 

and keep 60 seconds

reduce the gas pressure to 1400pa

the fire shouldn’t extinct. 

b)

 

Neither flame off nor back burning should appear when the flame is in the fire hole of burner.

 

c)

 

There  should  be  no  cracks  and  graze  in  the  glass  components  and  china  components,  besides  the 
fringe of them. 

d)

 

In  Rated  gas\rated  gas  pressure

ignite  the  burner

test  the  time  from  ignition  to  burner  working 

stably

it should not be more than 5 seconds. 

e)

 

In Rated gas\rated gas pressure

after the burner working for 15 minutes

turn off the plug valve

then test the time during turning off plug valve and    flame-out protection device shutting down

it 

should be less than 90 seconds. 

f)

 

Every  burner  should  be  test  ignition 

fuse  transferring  time\  flame  stabilization

ignition\  fuse 

transferring  time  should  be  less  than  5  seconds.  Flame-out  will  be  allowed  in  5  seconds  after 
ignition

but flame should be stable in 1 minute. 

g)

 

If it may cause security problems after corrosion, electric current and other mental parts should be 
corrosion  resistance  under  the  normal  conditions  of  use.  Live  parts  and  heat  insulator  should  be 
prevented  to  contact  with  each  other  unless  the  heat  insulator  is  corrosion  resistance  , 
non-hygroscopic and flame-retardant. 

h)

 

The shaft of Knob, handle ,control stick and other similar parts should be electrically neutral unless 
the shaft is out of the reach when the other parts are taken down. 

i)

 

The clamp device of ground terminal should be tight enough to avoid accidental loosening. The wire 
length  from  power  cord  block  terminal  or  cord  fixing  device  to  block  terminal  should  be 
appropriate  .If  the  flexible  cord  slips  off  from  the  cord  block  terminal,  current  carrying  conductor 
should tighten firstly compared with earth conductor. 

j)

 

Phenomenon that may reflect cooking appliance performance should not appear of the pan support 
in normal use. 

k)

 

Gas tightness should be accord with standard request after the gas connection was disassembled five 
times. 

Summary of Contents for 60G SERIES

Page 1: ...Any incorrect maintenance may result in other dangers The power and gas supply must be cut off before maintenance A new power cord which meets the relevant technical requirements must be used once pos...

Page 2: ...switch Harness 13 5 3 5 Disassemble of the Gas Pipe 14 5 3 6 Disassemble of the Bottom Cup 14 5 3 7 Disassemble of the Power Cord Assembly 14 5 3 8 Disassemble of the igniter 15 5 3 9 Disassemble of t...

Page 3: ...3 7 2 Replacement of the injector of the burners 22 8 Appendix 24 Technical quality requirements for Built in gas hob 24...

Page 4: ...k fire or other hazards 7 You must conduct a gas leakage test after receiving after sales service in gas pipe and gas connector Never touch any circuit wiring with your hand nor with uninsulated tool...

Page 5: ...5 2 Description of the appliance 2 1 Features Glass Q502 GXX Stainless Q411 SXX...

Page 6: ...6 2 2 Components and parts 1 Burner 2 Pan support 3 Knob 4 Drip tray...

Page 7: ...xxx 590 95 500 Q44xxxx 580 95 510 Q45xxxx 600 95 510 Q501Gxx 705 110 460 Q502Gxx 770 110 510 Q502Sxx 760 110 500 60Qxxxxxx 580 86 500 60Gxxxxxxx xxx 600 110 510 70Gxxxxxxx xxx 705 110 510 75G50xxxxx x...

Page 8: ...30 min Q501Gxx 667 470 30 min Q502Gxx 730 470 30 min Q502Sxx 730 470 30 min 60Qxxxxxxx 560 480 30 min 60Gxxxx08x xxx 553 473 30 min 60Gxxxx4xx xxx 553 473 30 min 60Gxxxx006 xxx 580 490 30 min 60Gxxxx...

Page 9: ...tted above the appliance in line with the edges of the appliance is 400mm The minimum distance combustible material can be fitted directly above the appliance is 700mm This panel a must be positioned...

Page 10: ...10 4 Electric Diagram a Four burners model b Five burners model...

Page 11: ...WARNING Turn off power for safety and appliance protection Close middle valve to prevent gas leakage Keep away from inflammable materials around appliance Before work put on gloves CAUTION Cool off t...

Page 12: ...ws on the Top Plate a Remove the screws of the burner b In some versions remove screws on the side of bottom plate c Be careful in order not to damage screw heads when disassembling d Be careful not t...

Page 13: ...Ignition pin out of the igniter Step 3 When reassembling replace parts correctly 5 3 4 Disassemble of the Microswitch Harness Step 1 Before you disassemble the harness take off the plastic e ring Step...

Page 14: ...the bottom cup Step 2 Detach the bottom cup from the base box burner 5 3 7 Disassemble of the Power Cord Assembly Step 1 Detach the wire from the Microswitch Harness Step 2 Hold housing of the wire by...

Page 15: ...nifold Pipe Assembly Step 1 Remove 5 screws Step 2 Remove the screw to take off pipe assy Step 3 Remove 2 screws and detach the valve from the manifold pipe assembly Step 4 You must check the gasket w...

Page 16: ...g gas connection elbow the other for tightening gas hose Step 2 Tighten enough to prevent gas leakage Step 3 Once you re done conduct leakage test 5 3 11 Disassemble of the bottom plate Step 1 Separat...

Page 17: ...ouple in the hole of the bottom cup Step 3 screw up the nut to fix the thermocouple 5 4 3 Reassemble of the Gas Pipe Step 1 Insert the head of the gas pipe into installation parts of the bottom cup or...

Page 18: ...18 6 Troubleshooting 6 1 Troubleshooting...

Page 19: ...19 6 2 Problems and Corrective Measures...

Page 20: ...20 Note 1 Check the ground wire before the fault is detected 2 Enough attention must be given to high voltage circuit...

Page 21: ...e must be controlled below 0 5mL min as required in the test 2 Simple procedures a Connect the product to the gas source being used b Smear soapy water at each joint of the product gas pipelines the p...

Page 22: ...a replaceable gas type fitting onto the main gas tube 7 2 Replacement of the injector of the burners Tool 7mm box spanner Steps for operation Step 1 Remove the pan support burner lid and flame spreade...

Page 23: ...23 Comparison list for injector replacement Nominal heat input and rates see below at 15 at 1013mbar...

Page 24: ...n 5 seconds Flame out will be allowed in 5 seconds after ignition but flame should be stable in 1 minute g If it may cause security problems after corrosion electric current and other mental parts sho...

Reviews: