PD-HW15-SP COVER REMOVAL AND WIRING
INSTALLATION (CONTINUED)
PD-415R-SP / PD-420R-SP MOUNTED
TO VISIONFRAME™ MONITOR WALL
Rack Mount Screws (4)
Threaded
Clips (2)
Rack Mount Screws (2)
Rack Mount Screws (2)
1) Remove two (2) cover screws to access wiring.
(FIGURE A)
2) Wire the device though electrical fitting openings as shown.
(FIGURE A)
•
The input (line) of the PD-HW15-SP must be
hardwired directly to an electrical
distribution panel.
•
The output (load) of the PD-HW15-SP must be
hardwired directly to an electrical junction
box or other AHJ-approved connection.
• Cord and plug type connections to the
PD-HW15-SP are explicitly prohibited.
•
Ground conductor must be green with
or without yellow stripe(s) and must be
connected to earth ground at the
service equipment or other
acceptable building earth ground.
3) Replace cover prior to restoring power.
Must be installed by Qualified Electrical Personnel (Licensed Electrical Contractor)
FIGURE A
GROUND WIRES
BLACK
WHITE
BLACK
WHITE
INPUT
(LINE)
OUTPUT
(LOAD)
Cover Screws (2)
Bracket
Mounting
Screws
Page 9
PD-HW15-SP MOUNTED
IN A STANDARD 19” RACK
Rack Mount Screws (2)
10-32 Sliding Nuts (2)
CAUTION:
To be installed with a minimum of 14 AWG (2.5 mm
2
) wire that complies
with local electrical codes.
!
CAUTION:
Conductors used to connect device should
be as short as possible.
!