
Chapter 7 Installation
5. Tighten the locking nut by turning it clockwise (left-hand thread).
Important note:
Ensure that the seal is clean and intact before tightening. Remove any
impurities and/or dirt. The manufacturer shall not be liable for any damage to the device caused
by leaky or faulty seals.
6. Check that the seal for the cable screw connection is positioned correctly on all sides and that no
foreign materials have been trapped between the housing, seal and locking nut.
Important note:
The manufacturer is not liable for any damage that is caused by seals that
are not positioned correctly.
7. Connect the antenna (see "Connecting the LoRa antenna" on page 54). The antenna is not included in
the scope of delivery and must be ordered separately.
8. Insert the power supply unit. The power supply unit is designed in such a way that it cannot be inserted
incorrectly.
Note:
Note that all power supply units with an integrated and rechargeable energy store are delivered
with a maximum charge of 30% in accordance with applicable transport regulations and must therefore
be fully charged before being used for the first time (see "Charging the power supply unit" on page 191).
Inserting the power supply unit
1
Power supply unit
2
myDatalogEASY IoTmini base unit
The following step is not mandatory.
9. Check whether the connection to the myDatanet server has worked correctly (see "Testing
communication with the device" on page 69).
Rev. 01
43