Chapter 4 General specifications
In addition, the operator must comply with the local legal requirements for
l
the safety of the personnel (accident prevention measures)
l
the safety of the equipment (protective equipment and maintenance)
l
the product disposal (waste disposal law)
l
the material disposal (waste disposal law)
l
the cleaning (cleaning agents and disposal)
l
and the environmental protection amendments.
Before commissioning, the operator must ensure that the installation and commissioning – provided these
were performed by the operator himself – are in compliance with the local regulations.
4.13 Personnel requirements
Installation, commissioning and maintenance may only be completed by personnel who meet the following
conditions:
l
Qualified specialist personnel with the relevant training
l
Authorised by the facility operator
Note: Qualified personnel
In the context of these instructions and the warnings on the product itself, individuals responsible for the setup,
installation, commissioning and operation of the product must have gained relevant qualifications relating to
their activities, including, for example:
l
Training, instruction and authorisation to activate/deactivate, ground and label electric circuits and
devices/systems in accordance with the standards of safety engineering.
l
Training or instruction on the maintenance and use of suitable safety equipment in accordance with the
standards of safety engineering.
l
First aid training
Rev. 01
15
Summary of Contents for BLE mA Link
Page 2: ......
Page 5: ...Chapter 2 Declaration of conformity Chapter 2 Declaration of conformity Rev 01 5 ...
Page 6: ...2 1 Declaration of conformity Appendix 6 Rev 01 ...
Page 8: ......
Page 16: ......
Page 19: ...Chapter 5 Functional principle Output current based on gas value Rev 01 19 ...
Page 20: ......
Page 22: ......
Page 34: ......
Page 36: ......
Page 38: ......
Page 40: ......
Page 42: ......
Page 44: ......