Installing the 1-mmHg Transducer Option Only
ASAP 2420 1-mmHg Transducer Option
2
Feb 2010
5. Lift the panel up and off the analyzer.
6. The 10-mmHg transducer must be removed from the top of the old transducer block and
installed on the front of the new block, and the 1-mmHg transducer must be installed on
top of the new block. For reference, the following photograph shows the location of the
transducers after installation.
Location of 1-mmHg transducer mounted on top of transducer block
Location of 10-mmHg transducer mounted on front of transducer block
Analyzer Top Panel