Minimum wire area (mm
2
per meter)
Figure 1-12:
0.000
0.050
0.100
0.150
0.200
0.250
0.300
0.350
0.400
0.450
0.500
0.550
0.600
0.650
0.700
0.750
0.800
0.850
0.900
100
200
300
400
500
600
700
800
900
1000
M
in
im
um
W
ire
A
re
a
(m
m
2
)
Distance of Installation (m)
Minimum Wire Area (mm
2
)
22.8V
24V
1.5
Perform a pre-installation meter check
1.
Remove the meter from the box.
CAUTION!
Handle the meter with care. Follow all corporate, local, and national safety regulations
for lifting and moving the meter.
2.
Visually inspect the meter for any physical damage.
If you notice any physical damage to the meter, immediately contact Micro Motion
Customer Support at
.
3.
Position and secure the meter in a vertical position with the flow arrow pointing
upward.
4.
Connect the power wiring, and power up the meter.
Remove the back transmitter housing cover to access the
PWR
terminals.
Planning
Installation Manual
9