![MHS Boilers Alpha Jetstream MD Installation And User Manual Download Page 9](http://html1.mh-extra.com/html/mhs-boilers/alpha-jetstream-md/alpha-jetstream-md_installation-and-user-manual_1783514009.webp)
Boiler room
The installation must be arranged in accordance with Mandatory Regulations and Codes
arrangement
of Practice. The following sketch shows the recommended minimum dimensions of
clearance around the bolier for servicing and maintenance
Boiler room should not be used for any other applications, floor should always be kept dry
and clean. Any obstacles in front of ventillation openings must be avoided. The boiler room
air openings must conform to the requiements of BS 5410 Pt2 or BS 6644 as appropriate
Never drain the system unnecessarily.
Follow instructions for periodic cleaning and maintenance operations whose procedures
are given further in this manual.
The boilers must be installed onto a smooth level surface of non-combustible material.
A steel baseframe and a 50 mm thick mineral wool mat to insulate the underneath of the
boiler are included in the supply. A raised plinth shall be used. It is recommended that
the plinth be at 150 mm high and sized to the dimensions of casing of the boiler given as
in the following table:
PREPARATIONS BEFORE ASSEMBLY
Recommended dimensions of plinths (mm)
Type
MD4 MD5 MD6 MD7 MD8 MD9
Width 830
Length
775 905 1035 1165 1295 1425
Height 150
Summary of Contents for Alpha Jetstream MD
Page 3: ......
Page 11: ......
Page 20: ...ASSEMBLY INSTRUCTIONS...
Page 23: ......
Page 25: ...EXPLODED DRAWINGS MD JETSTREAM EXPLODED DRAWING BOILER GROUP...
Page 26: ...EXPLODED DRAWINGS ALPHA JETSTREAM MD EXPLODED DRAWING INSULATION AND OUTER CASINGS...