![MHG Heating GZ 2 Installation, Operation & Maintenance Instructions Manual Download Page 22](http://html1.mh-extra.com/html/mhg-heating/gz-2/gz-2_installation-operation-and-maintenance-instructions-manual_1783421022.webp)
Installation-Operation-Maintenance
GZ 2 - GZ 4 / 100 - 1450 kW
22
Circuit diagramm GZ 4
Fig. 22:
Obser
ve local and V
D
E-
regulations.
* Parts to be supplied
on site
Pr
inciple cir
cuit
Connector as per DIN
Engine valve
Working hours 2
Working hours 1
Failure
When using
th
e leak
check
Item
b2*
b3*
b4*
b5*
b6
b8
c1
e1*
e2
IS
m1
m2
m3
s1
s2
u1
u2
Indication
On-off-S
w
itch
Saf
et
y t
her
most
at
On-off-the
rmosta
t 1
On-off-the
rmosta
t 2
Gas pressure switch
A
ir pressure switch
Motor conta
ctor
Motorsicherung
Bimet
allic r
elais
Ionisation electrode
Motor
Igni
tion tra
nsforme
r
Se
rvomotor
Solenoid valve
Engine valve
Ga
s burne
r a
utoma
tic sa
fe
ty
Leakage t
est
er
Sensor selection switch to
"ION
"