Installation-Operation-Maintenance
GZ 2 - GZ 4 / 100 - 1450 kW
20
Circuit diagramm GZ 3.0
Item
b2
b3
b4
b5
b6
b8
IS
k1
m1
m2
m3
s1
s2
u1
u2
Indic
ation
On-off-Switch
Safety thermostat
On-off-thermostat
On-off-thermostat
Gas pressure switc
h
Air pressure switc
h
Infra-red flicker detector
Condenser
Motor with c
ondenser
Ignition transformer
Servomotor
Solenoid valve , two-stage
(stage 1 and 2)
Safety solenoid valve
Gas burner automatic safety
control
Leakage tester
Observ
e loc
al and VDE-regulations.
Connec
tions to earth potential being
executed carefully.
Fig. 20:
Also when using the leak check
Caution:
do not confuse phase and Mp.
Multibloc
W
orking hours 2
W
orking hours 1
Failure