34003602EN/AB
- Page 25
300 mm
< 1m
< 4m
2. Installation
Comet S31 15/20KVA
Checking the indicator light
(see section 1.5 "Indicator lights")
◗
Put the
UPS
back into operation.
◗
Check the status of the UPS green indicator light
10
:
- on steady for 5s (status 1 in the table),
- then regular flashing every second (status 3 in the table).
◗
Check the status of CD indicator light
9
:
- off for 5s,
- then regular flashing (status 3 in the table).
PowerServices TelPac
is now ready for the parameter setting
stage that is necessary for Teleservice.
Consult the Technical Support documentation.
Lastly, proceed to step 2 (see section 2.1 "Procedure").
16
All manuals and user guides at all-guides.com