![METRON QA-ST MKII Getting Started Manual Download Page 5](http://html1.mh-extra.com/html/metron/qa-st-mkii/qa-st-mkii_getting-started-manual_1779893005.webp)
QA-ST MKII –
Getting Started Guide
2
3
Setup for Automated Testing
1.
Perform all steps under “Setup for Manual Testing” on the previous page.
2.
Connect one end of the NULL-modem cable to the RS-232 port on the left side
of the
QA-ST MKII
.
3.
Connect the other end of the NULL-modem cable to an applicable COM port on
your computer.
4.
Consult the
ansur test executive User Manual
and the
ansur QA-ST Plug-In User
Manual
for instructions on building and executing the automated test templates.
5.
Perform any of the
QA-ST MKII
electrical safety tests.
4 Tests
For each test listed below, the following information is provided: test name, unit of
measure, and options. (“Options” include assorted, user-selectable power conditions,
as well as the AC/DC measurement selection.)
AC/DC Measurement Selection
To select AC or DC measurements when the selection is available, press the
AC/DC
button. The display will reflect the change in measurement type.
OE – Open Earth Test
This test will break the connection of the Earth power line to the DUT. To select
Open Earth measurements when the selection is available, press the
open gnd
button. The display will reflect the change in measurement type.
ON – Open Neutral Test
This test will break the connection of the Neutral/L2 power line to the DUT. To
select Open Neutral measurements when the selection is available, press the
open
neutral
button. The display will reflect the change in measurement type.