5-6
e.
Use a current source to generate an AC current between Pa-
tient Leads 1-10 and EARTH. Check that both the level of
this current, and the current readout on the QA-90 display,
are equal. Press
STOP (F1)
.
f.
Press the
PL
key on the keypad, then , press
PREV (F3)
or
NEXT (F4)
to ensure that the module with Patient Lead 11
(blue lead) is active.
g.
Press
GO BACK (F2)
to return to the test window, then
press
START (F1)
and run the same test between Patient
Lead 11 and EARTH. Repeat the test with different current
values. Press
STOP (F1)
.
h.
Press
GO BACK (F2)
to return to Manual Test Setup Win-
dow 3.
4.
Patient Leakage Current DC
a.
Press
Patient Leakage Current DC (F5)
.
b.
Select
Normal Condition (F7)
.
c.
Press the
PL
key on the keypad to ensure that the module
with Patient Leads 1-10 (white leads) is active. If not, press
PREV (F3)
or
NEXT (F4)
so that it is active.
d.
Press
GO BACK (F2)
to return to the test window, then
press
START (F1)
.
e.
Use a current source to generate an DC current between Pa-
tient Leads 1-10 and EARTH. Check that both the level of
this current, and the current readout on the QA-90 display,
are equal. Press
STOP (F1)
.
f.
Press the
PL
key on the keypad, then , press
PREV (F3)
or
NEXT (F4)
to ensure that the module with Patient Lead 11
(blue lead) is active.
g.
Press
GO BACK (F2)
to return to the test window, then
press
START (F1)
and run the same test between Patient
Lead 11 and EARTH Repeat the test with different current
values. Adjust the General I-constant if the values between
UUT and reference are not equal. Press
STOP (F1)
.
h.
Press
GO BACK (F2)
until you return to Manual Test Setup
Window 3. Then, press
MORE (F1)
to advance to Manual
Test Setup Window 4.
Patient Auxiliary Current AC ..........> F7
Patient Auxiliary Current DC ..........> F6
Mains on Applied Part .................> F5
Summary of Contents for QA-90
Page 1: ...QA 90 User Service Manual QA 90 Electrical Safety Analyzer P N 11025 V 3 13...
Page 14: ...2 4 This page intentionally left blank...
Page 30: ...3 16 This page intentionally left blank...
Page 40: ...4 10 MANUAL TEST SETUP F7 Mains Voltage F6 Current Consumption F5 MORE MAIN MENU F1 F2 F3 F4...
Page 44: ...4 14 This page intentionally left blank...
Page 51: ...5 7 MORE GO BACK MAIN MENU F1 F2 F3 F4...
Page 60: ......
Page 68: ...6 8 This page intentionally left blank...
Page 86: ...A 18 This page intentionally left blank...
Page 88: ...B 2 This page intentionally left blank...
Page 90: ...B 4 Measuring Board Component Location Layer 1...
Page 91: ...B 5 Measuring Board Component Location Layer 2...
Page 92: ...B 6 Measuring System Schematic Diagram Part 1 Measuring Preparation...
Page 93: ...B 7 Measuring System Schematic Diagram Part 2 High Voltage Interface...
Page 94: ...B 8 Measuring System Schematic Diagram Part 3 High Voltage Logic...
Page 97: ...B 11 Measuring System Schematic Diagram Part 6 Measurement Matrix...
Page 98: ...B 12 Measuring System Schematic Diagram Part 7 Program Amplifier and Lowpass...
Page 99: ...B 13 Measuring System Schematic Diagram Part 8 Relay Drivers...
Page 100: ...B 14 Microprocessor Board Component Location...
Page 102: ...B 16 Microprocessor System Schematic Diagram Part 1 QA 90...
Page 103: ...B 17 Microprocessor System Schematic Diagram Part 2 Integrated Keypad...
Page 104: ...B 18 Microprocessor System Schematic Diagram Part 3 CPU...
Page 105: ...B 19 Microprocessor System Schematic Diagram Part 4 CPU...
Page 106: ...B 20 Microprocessor System Schematic Diagram Part 5 Printer and Display Interface...
Page 108: ...B 22 This page intentionally left blank...
Page 110: ...C 2 This page intentionally left blank...
Page 112: ...D 2...