MI 3108 EurotestPV
Data handling
91
BONDING Gas
BONDING Structural Steel
BONDING Other
BONDING Earthing conductor
CONNECTION 001
…
CONNECTION 199
OBJECT 002
...
OBJECT 199
Figure 8.1: Instrument memory organization
The memory structure is organized in a way that is suited to BS 7671 and other verification
documents (Electrical Installation Certificate, Periodic Inspection Report etc.). If the
results are stored in appropriate memory locations an automatic creation of a certificate/
report is possible.
Display organization
The
installation structure field
describes the location of the measurement (which object,
board, circuit, connection).
In the
measurement field
there is information about type and number of measurements
that belong to the selected structure element (object and block and circuit and
connection).
The main advantages of this system are:
Test results can be organized and grouped in a structured manner that reflects the
structure of the electrical installation.
Customized names of data structure elements can be uploaded from EurolinkPRO
PCSW.
Simple browsing through the structure and results.
Test certificates/ reports can be created with no or little modifications after
downloading results to a PC.
Figure 8.2: Installation structure and measurement fields
Installation structure elements
Memory operation menu
Data structure field
1
st
level:
OBJECT
: Default location name (object and its
successive number).
2
nd
level: