5. Installation
5.1 Unpacking the appliance
Check that all the parts have been delivered, that the machine operates as intended,and
that nothing has been damaged in transit. The machine supplier should be notified of any
shortcomongs within eight days.
5.2 Installation
The surface on which the machine is installed must be stable, not inclined, balanced, at a
right height in order to obtain a correct working position. The surface sizes must take ma-
chine overall dimensions (see “Installation drawing”) into considerations.
Working area must be dry, away from heating sources and from passing gangways; it
must allow an easy normal machine use, cleaning and maintenance.
5.3 Electrical connections
Connect the machine to an electric power supply which is suitable for the machine.
If the machine does not perfom correctly, call a specialist for remedying the fault before
taking the machine into operation.
Summary of Contents for MONDIAL 300
Page 1: ...SLICING MACHINE MONDIAL 300 Installation and Operation Manual S N Rev 2 0...
Page 2: ......
Page 4: ...26 7 2004 Rev 2 0 2...
Page 6: ...26 7 2004 Rev 2...
Page 13: ...26 7 2004 Rev 2 0 Operation instructions 7...
Page 15: ...26 7 2004 Rev 2 0 Technical specifications 25 7 Technical specifications...
Page 16: ...Wiring diagram...
Page 17: ...Installation drawing...
Page 19: ......