mechanical ventilation, activated periodically during fuel filling and slagging of boilers, ensuring a
minimum of 10 full air changes per hour;
●
natural lighting shall be provided in the boiler room, illuminating the boiler from the front, and the
window area shall be a minimum of 1/15 of the boiler room floor area; half of the windows shall be
operable; electrical lighting and an electrical outlet, not exceeding 24 V, shall also be provided in the
room;
●
there should be a drainage sump in the floor to allow cooling of the water and its capacity should be
equal to the water capacity of the largest boiler, but not more than 2 m
3
;
●
in the boiler room, the thermal pipes should be insulated;
●
The boiler position with the minimum required distances is shown in the boiler room diagram below.
Minimum distances for positioning the boiler in the boiler room
Summary of Contents for SEMAX OPTI
Page 2: ......
Page 30: ...METAL FACH Heating Technology 28...
Page 36: ...METAL FACH Heating Technology 34...
Page 38: ...METAL FACH Heating Technology 36...
Page 40: ...METAL FACH Heating Technology 38...
Page 47: ......