Connection of the boiler with the heating system
(Installer)
The boiler should be connected to the central heating system by a company authorized by the manufacturer,
and the correct connection should be confirmed on the warranty card attached to this manual. The boiler
should be connected in accordance with the manufacturer's recommendations, in accordance with this manual.
ATTENTION!
It is recommended that the boiler be commissioned for the first time in accordance with
the guidelines contained in the Operation and Maintenance Documentation by a person
with valid authorizations - (Information on persons authorized to start the boiler is
available from the Manufacturer - tel. +48 85 711 94 56).
ATTENTION!
The temperature of water returning from the system to the central heating boiler should
not be lower than 45ºC.
ATTENTION!
An APV valve must be installed (min.45 ° C)
Summary of Contents for SEMAX OPTI 16
Page 2: ......
Page 12: ...METAL FACH Heating Technology 10 Boiler dimensions User Installer Boiler SEMAX OPTI...
Page 32: ...METAL FACH Heating Technology 30...
Page 38: ...METAL FACH Heating Technology 36...
Page 40: ...METAL FACH Heating Technology 38...
Page 42: ...METAL FACH Heating Technology 40...
Page 49: ...METAL FACH Heating Technology 47...
Page 50: ...METAL FACH Heating Technology 48...
Page 51: ......