![Mestek M) S/U 200 Installation And Operation Instructions Manual Download Page 34](http://html1.mh-extra.com/html/mestek/m-s-u-200/m-s-u-200_installation-and-operation-instructions-manual_1775684034.webp)
Form 43343350
Oct 2013
-33-
14.0)
INSTRUCTIONS FOR PRESSURE TEST GAUGE CONNECTION
SIDE VIEW
43269050 Rev. A 03/08
DANGER
Failure to do so may result in death,
serious injury or property damage
FIRE HAZARD
This access panel must be closed
tightly with all the necessary screws
during operation.
Never operate the heater with the
access panel open or removed.
Failure to do so may result in death, serious injury or property
damage.
The access doors on either side of the burner must
be securely fastened before operating the heater.
The access panels must be closed tightly with all the necessary
screws during operation.
Never operate the heater with the access panel open or removed.
SUPPLY PRESSURE
SUPPLY PRESSURE
SUPPLY PRESSURE
SUPPLY PRESSURE
1.
The installer will provide a 1/8” N.P.T. tapped plug, accessible for test gauge connection immediately
upstream of the gas supply connection to the heater.
MANIFOLD
MANIFOLD
MANIFOLD
MANIFOLD PRESSURE
PRESSURE
PRESSURE
PRESSURE –
–
–
– COMBINATION GAS VALVE IS FACTORY SET
COMBINATION GAS VALVE IS FACTORY SET
COMBINATION GAS VALVE IS FACTORY SET
COMBINATION GAS VALVE IS FACTORY SET
1.
Turn the gas valve to the “OFF” position. Remove the 1/8” plug from the combination gas valve at the
Outlet Pressure T
Outlet Pressure T
Outlet Pressure T
Outlet Pressure Tap
ap
ap
ap shown below and connect a 1/8” nipple to the tapped hole. Connect the test gauge to
the nipple. Turn on the gas supply.
Pressure Regulator Adjustment
(under cap screw)
1/8 NPT
Inlet Pressure
Tap with 3/16 Hex
Allen Wrench Plug
1/8NPT
Outlet Pressure
Tap with 3/16 Hex
Allen Wrench Plug
Gas Control
Knob
Wiring
Terminals (2)
Ground
Terminals (2)
OUTLET
INLET
CAUTION
Never jumper these terminals. This
shorts out valve coil and may burn
out heat anticipator in thermostat.
STEP-OPENING
GAS CONTROL VALVE
ON
OFF
MV
MV
1-STAGE CONTROLS