3-22
Pre-Start Inspection and Operation
b. Remove the protective covers (Items 4,
) from the attachment quick
connectors.
c. Wipe off the end of each of the connectors (Items 1, 2, 3, 5,
dirt or debris.
Figure 3–33 Auxiliary Hydraulic Quick Connects
d. Insert the attachments’ male coupling (Item 3,
) into the female bulkhead
quick connect coupling (Item 2,
) on the machine and push until the
connector locks into position.
e. Repeat the above process to connect the attachments’ female quick connect (Item 5,
) on the other hose to the male bulkhead connector (Item 1,
) on
the machine.
f. Check the security of both connections by gently tugging on the attachment hoses to
make sure that the quick connects are seated properly.
4
2
1
4
3
5
1
2
3
5
2225
Summary of Contents for 999-848.01
Page 6: ...iv Mertz Manufacturing LLC P O Box 150 Ponca City OK 74602 Affix Stamp Here...
Page 8: ...vi...
Page 18: ...1 8 Safety Precautions...
Page 26: ...2 8 Operating Controls...
Page 54: ...3 28 Pre Start Inspection and Operation...
Page 86: ...5 4 Troubleshooting...