background image

25

Specifications

Model number  

G915D

Supply required  

230-240V ac, 50Hz

Extra Low Voltage supply  

(optional) 4 A per motor at 12 V dc

Battery backup  

(optional) 12 V, 1.2 Ah

Rated load  

max 150 N (approx. 15 kg force) at right angles to the end 
of the primary arm

Rated duty cycle 

max 80%

Stand-by power consumption  max 0.5 W (with no accessories fitted)
Operating power consumption max 40 W per motor
Gate length  

max 2 m

Gate weight  

max 140 kg

Operating time  

typ 20 seconds (increases with load)

Opening angle  

max 120 degrees

Replacement board fuse  

2 A (5 x 20)

Replacement motor fuse  

10 A (5 x 20)

Remote control battery  

Depends on model, either 4LR44 (6V) or CR2025 (3V)

Gate stops  

optional but recommended

Gate solenoid lock  

optional but recommended (ELU card and separate 12 V 
dc power supply is required to control and power a solenoid 
lock)

Accessory output  

12 V dc, max 150 mA total (fused)

Operating temperature range  -20 to +55 °C
Receiver  

Integrated 433 MHz high-security code-hopping

No. of Users  

40 transmitters max

Memory  

EEPROM, access via GT/SYSTEM

Compatible transmitters  

All Merlin 433 MHz keyring or wall mounted transmitters, 
wireless wall-switches, wireless keypad

NOTE

  Any additions or alterations outside of these specifications may void the product’s 

warranty.

Summary of Contents for G915D

Page 1: ...ease have your serial number and model name available before calling Australia 1800 638 234 New Zealand 0800 653 667 United Kingdom 0800 073 0112 www merlingo com G915D remote control openers security...

Page 2: ...with a switch that prevents the drive from operating when the wicket is open Connect a Normally Closed switch to the STP and GND terminals of the controller board Locate controls carefully Install an...

Page 3: ...he power supply from the drive before cleaning or maintaining the gate or drive The drive or gate may operate unexpectedly due to other users with remote controls or due to automatic closing if enable...

Page 4: ...d Keep the path of the gate free from debris and foliage The gate and its moving parts may sustain damage or wear presenting additional load to the opener Frequently examine the installation for signs...

Page 5: ...D will blink during learning The controller is ready for another wireless control when the red LED is steadily lit 4 Press P2 RADIO to exit learning mode NOTE The learning procedure will time out afte...

Page 6: ...the gate The gate hinge pivot points should be perfectly parallel to a plumb line When closed the gate leaves should line up evenly and not bind against each other The leaves should not be damaged or...

Page 7: ...control wires in the same conduit Low voltage cable sizes Voltage will drop along low voltage cables over long distances It is recommended to use cable with conductors of the following minimum cross...

Page 8: ...for the weather conditions 6 Keyed switch must be rated suitably for the weather conditions 7 Keypad Merlin M840 wireless optionally with wired power supply 8 Solenoid lock or latch avail for horizont...

Page 9: ...uld be no more than 200 mm forward of the mounting face of the drive For 120 degrees of opening the mounting bracket should be offset by 160 mm from the hinge Additional side room may be required 420t...

Page 10: ...To spread the load all mounting holes should be used Mount the centre line of the bracket 130 mm from the inside edge of the gate post Use fasteners of at least 10 mm diameter x 75 mm length Rising hi...

Page 11: ...otor voltage above 10 V or above 20V for 24V systems battery input A 12V 1 2 Ah sealed back up battery is recommended and should result in suf cient capacity for at least ve full operations in the rst...

Page 12: ...les a short delay before opening to allow the lock to release before the gate leaf moves The LCU Lamp Control Unit module can accept a lamp rated at up to 12V 15W tx photocell power out TXF photocell...

Page 13: ...mally Open input can connect to safety devices such as pressure edges or to a switch that enables one wing to open Activating a safety device will prevent movement from fully open or fully closed and...

Page 14: ...e control Wait 10 seconds to exit learning mode Install the CH RADIO jumper Press and hold P2 RADIO until the red LED is lit Press the second button on the remote control Wait 10 seconds to exit learn...

Page 15: ...ing The following steps are performed automatically 1 Detects whether one motor or two is tted 2 Sets pedestrian opening on M1 leaf to half way 3 Checks for presence of photocells or a jumper on PHO t...

Page 16: ...sh for ve seconds and then the board will be ready to operate No memory settings are altered when RESET is pressed No learned wireless transmitters are removed from memory enable testing of safety dev...

Page 17: ...by the motor power and the time that the power is applied to the obstruction Motor power is determined by the maximum voltage and maximum current This FOR setting alters the motor voltage The Applica...

Page 18: ...Professional Setup the above behaviours will be modi ed accordingly PAU full anti clockwise Gate opening stop if the beam is interrupted continue opening when the beam is clear once open the gates wi...

Page 19: ...f between 3 and 30 seconds enable lock strike delay jumper STRIKE If the ELU module is connected along with an electric lock then this jumper may be required When the STRIKE jumper is connected across...

Page 20: ...process than to press the P1 SET and P2 RADIO buttons on the controller board If so learn one button for P1 learn the button with the CH RADIO jumper removed and one button for P2 learn the button wit...

Page 21: ...ress P1 SET if Pedestrian Access is required The M1 leaf will begin opening Press P1 SET at the time where the Pedestrian Access wing is at the desired open position The leaf will close fully and the...

Page 22: ...iced if it is heavy to move by hand Transmitter range is less than normal Your transmitter battery may be going at If you have an external antenna then the wire may be damaged SOLUTION Replace the tra...

Page 23: ...23...

Page 24: ...building to which the Unit is attached G Faulty or at batteries in the remote control transmitter H Where the defect is due to conditions other than normal domestic use or dirt misuse neglect re acci...

Page 25: ...rd fuse 2 A 5 x 20 Replacement motor fuse 10 A 5 x 20 Remote control battery Depends on model either 4LR44 6V or CR2025 3V Gate stops optional but recommended Gate solenoid lock optional but recommend...

Page 26: ...es or phone Merlin toll free New Zealand Auckland phone 09 415 4393 Phone toll free 0800 653 667 or 0800 MERLIN Fax toll free 0800 653 663 Australia NSW Vic Qld WA Phone toll free 1 800 638 234 Fax to...

Page 27: ...5 sec 0 1 sec delay 2 5 sec delay DEL leaf closing delay 3 to 60 sec 3 sec close delay 30 sec close delay STRIKE delay open 1 sec TEST delay all 0 2 sec RESET 1 flash G815D 2 flashes G950 G915D red P2...

Page 28: ...OFF cw OFF Force speed voltage 50 100 cw max STRIKE jumper ON OFF TEST jumper ON OFF Gates New or existing Leaf width x height Construction type coverage Load measured at gate bracket without opener c...

Reviews: