Important safety instructions for 
installation

WARNING

 Incorrect installation can lead to severe injury. Follow all installation 

instructions.  Merlin  Garage  Openers  Limited  does  not  accept  responsibility  for 
damage or injury resulting from installing this opener.

Prepare the gate for safe automation

Before  installing  the  drive  remove  or  disable  any  equipment,  such  as  locks,  that  is  not 
needed for powered operation. 
Check that the gate is in good mechanical condition and that it opens and closes properly. 
Do  not  use  force  sensitivity  adjustments  to  compensate  for  a  binding  or  sticking  gate. 
Excessive force may damage the gate.

Avoid possible entrapment points

Ensure that entrapment between the driven part and the surrounding fixed parts due to the 
movement of the driven part is avoided.
Gaps are considered safe as follows (IEC60335-2-103): finger gaps above 25 mm; foot 
gaps above 50 mm; head gaps above 300 mm; and whole body gaps above 500 mm.

Add over-ride switch if wicket gate is present

If a wicket gate is present in one of the gate leaves, it must be fitted with a switch that 
prevents the drive from operating when the wicket is open. (Connect a Normally Closed 
switch to the STP and GND terminals of the controller board.)

Locate controls carefully

Install any fixed control, wired or wireless, within sight of the gate but away from moving 
parts and at a height of more than 1.5 m.

Fit non-contact safety beams

Where they are not already explicitly required to comply with regulations, Merlin strongly 
recommends fitting non-contact safety beam sensors.

Locate the entrapment warning sign correctly

After installing the gates, the included entrapment warning sign must be fitted within sight 
of anyone that may stand in the path of the moving gate.

Inspect and test the installation

After  installation,  ensure  that  the  mechanism  is  properly  adjusted  and  that  and  the 
protection system and manual release function correctly.

Educate the owner

Before  passing  controls  to  the  owner,  alert  them  to  the  potential  dangers,  and  routine 
checks they’re required to perform.

Complete the commissioning check sheet

The  commissioning  check  sheet  at  the  end  of  this  manual  must  be  completed,  signed 
by  the  installer  and  client,  and  kept  on  record  by  the  installing  company.  It  contains  a 
declaration that all safety related procedures have been complied with.

Summary of Contents for G915D

Page 1: ...ease have your serial number and model name available before calling Australia 1800 638 234 New Zealand 0800 653 667 United Kingdom 0800 073 0112 www merlingo com G915D remote control openers security...

Page 2: ...with a switch that prevents the drive from operating when the wicket is open Connect a Normally Closed switch to the STP and GND terminals of the controller board Locate controls carefully Install an...

Page 3: ...he power supply from the drive before cleaning or maintaining the gate or drive The drive or gate may operate unexpectedly due to other users with remote controls or due to automatic closing if enable...

Page 4: ...d Keep the path of the gate free from debris and foliage The gate and its moving parts may sustain damage or wear presenting additional load to the opener Frequently examine the installation for signs...

Page 5: ...D will blink during learning The controller is ready for another wireless control when the red LED is steadily lit 4 Press P2 RADIO to exit learning mode NOTE The learning procedure will time out afte...

Page 6: ...the gate The gate hinge pivot points should be perfectly parallel to a plumb line When closed the gate leaves should line up evenly and not bind against each other The leaves should not be damaged or...

Page 7: ...control wires in the same conduit Low voltage cable sizes Voltage will drop along low voltage cables over long distances It is recommended to use cable with conductors of the following minimum cross...

Page 8: ...for the weather conditions 6 Keyed switch must be rated suitably for the weather conditions 7 Keypad Merlin M840 wireless optionally with wired power supply 8 Solenoid lock or latch avail for horizont...

Page 9: ...uld be no more than 200 mm forward of the mounting face of the drive For 120 degrees of opening the mounting bracket should be offset by 160 mm from the hinge Additional side room may be required 420t...

Page 10: ...To spread the load all mounting holes should be used Mount the centre line of the bracket 130 mm from the inside edge of the gate post Use fasteners of at least 10 mm diameter x 75 mm length Rising hi...

Page 11: ...otor voltage above 10 V or above 20V for 24V systems battery input A 12V 1 2 Ah sealed back up battery is recommended and should result in suf cient capacity for at least ve full operations in the rst...

Page 12: ...les a short delay before opening to allow the lock to release before the gate leaf moves The LCU Lamp Control Unit module can accept a lamp rated at up to 12V 15W tx photocell power out TXF photocell...

Page 13: ...mally Open input can connect to safety devices such as pressure edges or to a switch that enables one wing to open Activating a safety device will prevent movement from fully open or fully closed and...

Page 14: ...e control Wait 10 seconds to exit learning mode Install the CH RADIO jumper Press and hold P2 RADIO until the red LED is lit Press the second button on the remote control Wait 10 seconds to exit learn...

Page 15: ...ing The following steps are performed automatically 1 Detects whether one motor or two is tted 2 Sets pedestrian opening on M1 leaf to half way 3 Checks for presence of photocells or a jumper on PHO t...

Page 16: ...sh for ve seconds and then the board will be ready to operate No memory settings are altered when RESET is pressed No learned wireless transmitters are removed from memory enable testing of safety dev...

Page 17: ...by the motor power and the time that the power is applied to the obstruction Motor power is determined by the maximum voltage and maximum current This FOR setting alters the motor voltage The Applica...

Page 18: ...Professional Setup the above behaviours will be modi ed accordingly PAU full anti clockwise Gate opening stop if the beam is interrupted continue opening when the beam is clear once open the gates wi...

Page 19: ...f between 3 and 30 seconds enable lock strike delay jumper STRIKE If the ELU module is connected along with an electric lock then this jumper may be required When the STRIKE jumper is connected across...

Page 20: ...process than to press the P1 SET and P2 RADIO buttons on the controller board If so learn one button for P1 learn the button with the CH RADIO jumper removed and one button for P2 learn the button wit...

Page 21: ...ress P1 SET if Pedestrian Access is required The M1 leaf will begin opening Press P1 SET at the time where the Pedestrian Access wing is at the desired open position The leaf will close fully and the...

Page 22: ...iced if it is heavy to move by hand Transmitter range is less than normal Your transmitter battery may be going at If you have an external antenna then the wire may be damaged SOLUTION Replace the tra...

Page 23: ...23...

Page 24: ...building to which the Unit is attached G Faulty or at batteries in the remote control transmitter H Where the defect is due to conditions other than normal domestic use or dirt misuse neglect re acci...

Page 25: ...rd fuse 2 A 5 x 20 Replacement motor fuse 10 A 5 x 20 Remote control battery Depends on model either 4LR44 6V or CR2025 3V Gate stops optional but recommended Gate solenoid lock optional but recommend...

Page 26: ...es or phone Merlin toll free New Zealand Auckland phone 09 415 4393 Phone toll free 0800 653 667 or 0800 MERLIN Fax toll free 0800 653 663 Australia NSW Vic Qld WA Phone toll free 1 800 638 234 Fax to...

Page 27: ...5 sec 0 1 sec delay 2 5 sec delay DEL leaf closing delay 3 to 60 sec 3 sec close delay 30 sec close delay STRIKE delay open 1 sec TEST delay all 0 2 sec RESET 1 flash G815D 2 flashes G950 G915D red P2...

Page 28: ...OFF cw OFF Force speed voltage 50 100 cw max STRIKE jumper ON OFF TEST jumper ON OFF Gates New or existing Leaf width x height Construction type coverage Load measured at gate bracket without opener c...

Reviews: