background image

Sla

ve D

oor

Lock
ing D

oor

Step 20

Fix the turn buttons into 

place at the top and 

bottom of door as shown in 

the diagram.

The turn buttons help to 

keep the doors alligned 

during high and low levels 

of moisture.

2x16mm Black Screws

20

Pre drill 

hole

16mm 

screw

It is ESSENTIAL that you apply wood 

treatment immediately after the building 

has been assembled.

AFTER TREATMENT:

score around protective

 cover on glazing and

 carefuly peel

 covering back

22

Step 18

Fix the presslock to the inside of the

master door, making sure to align the

barrel and the key hole. 

Secure to the master door with

4x16mm screws.

*Ensure the key turns fully without

any restrictions.

4x16mm Screws

Pre drill 

hole

16mm 

screw

Step 19

Attach to the barrel bolts to

the top and bottom of the

slave door using 4x10mm 

screws per bolt.

*Mark the position of the bolt

with a pencil on the framing 

and drill a hole to site the

bolts.                                                        

8x10mm Screws

21

Please retain product label and instructions for future reference

             

Pre drill 

hole

10mm                         

screw

Summary of Contents for BOURNEMOUTH 03BRN0707-V4

Page 1: ...affected during various weather conditions For the duration of heavy or extended periods of rain swelling of the wood panels may occur Warping of the wood may also occur during excessive dry spells du...

Page 2: ...t your building MADE IN GREAT BRITAIN Door Gable Plain Side QTY 2 Plain Gable Floor Roof Sheet QTY 2 Ridge Bar 1457mm Eaves Frame 2185mm QTY 2 Cover Trim 1682mm QTY 4 Fascia 1192mm QTY 4 Angled Fascia...

Page 3: ...s with 50mm screws as shown in the illustration making sure the gable sits inside the panel Do not secure the building to the floor until the roof is fitted 9x50mm Screws 10 18 Step 5 Attach the L bra...

Page 4: ...ce the assembled roof panels onto the building as shown in the illustration Fix into place using 8x30mm screws per side ensuring the roofs are flush with the top of the gables The roof panels should b...

Page 5: ...to the door gable as shown in the illustration Ensure the veranda floor sits centrally to the building 9 9 Step 13 Align the veranda sides against the door gable and flush to ends of the veranda floor...

Page 6: ...ase retain product label and instructions for future reference 13 13 13 13 16 Step 16 Fix the fascias and finials to the building using 6x40mm screws per side ensuring to screw through the boards into...

Page 7: ...on glazing and carefuly peel covering back 22 Step 18 Fix the presslock to the inside of the master door making sure to align the barrel and the key hole Secure to the master door with 4x16mm screws E...

Reviews: