background image

Pre drill 

hole

50mm 

screw

P 3

Please retain product label and instructions for future reference

             

Step 3

Place the plain gable and the first plain

side onto the floor.

 

Fix the corners with 50mm screws

 

as shown in the illustration,

 

making sure the gable sits inside

 

the panel.

 

Do not secure the building to the

 

floor until the roof is fitted.

3x50mm Screws

3

2

1

2

Pre drill 

hole

50mm 

screw

Step 4

Place the door gable and the second plain

side onto the floor.

 

Fix the corners with 50mm screws

 

as shown in the illustration,

 

making sure the gable sits inside

 

the panel.

 

Do not secure the building to the

 

floor until the roof is fitted.

9x50mm Screws

10

18

Step 5

Attach the “L” brackets centrally 

to the ridge bar using 2x30mm 

screws per bracket.

*Measure 67mm from each side

of the ridge bar and mark with

a pencil. Align the front edge of

the bracket with the pencil mark

as shown in the illustration.

4x30mm Screws

Pre drill 

hole

30mm 

screw

Step 6

Place the assembled ridge bar inbetween

the gables, resting on top of the blocks.

Secure to the gables using 2x30mm

screws per side.

*Adjust the “L” brackets if needed.

4x30mm Screws

Pre drill 

hole

30mm 

screw

Summary of Contents for BOURNEMOUTH 03BRN0707-V4

Page 1: ...affected during various weather conditions For the duration of heavy or extended periods of rain swelling of the wood panels may occur Warping of the wood may also occur during excessive dry spells du...

Page 2: ...t your building MADE IN GREAT BRITAIN Door Gable Plain Side QTY 2 Plain Gable Floor Roof Sheet QTY 2 Ridge Bar 1457mm Eaves Frame 2185mm QTY 2 Cover Trim 1682mm QTY 4 Fascia 1192mm QTY 4 Angled Fascia...

Page 3: ...s with 50mm screws as shown in the illustration making sure the gable sits inside the panel Do not secure the building to the floor until the roof is fitted 9x50mm Screws 10 18 Step 5 Attach the L bra...

Page 4: ...ce the assembled roof panels onto the building as shown in the illustration Fix into place using 8x30mm screws per side ensuring the roofs are flush with the top of the gables The roof panels should b...

Page 5: ...to the door gable as shown in the illustration Ensure the veranda floor sits centrally to the building 9 9 Step 13 Align the veranda sides against the door gable and flush to ends of the veranda floor...

Page 6: ...ase retain product label and instructions for future reference 13 13 13 13 16 Step 16 Fix the fascias and finials to the building using 6x40mm screws per side ensuring to screw through the boards into...

Page 7: ...on glazing and carefuly peel covering back 22 Step 18 Fix the presslock to the inside of the master door making sure to align the barrel and the key hole Secure to the master door with 4x16mm screws E...

Reviews: