P 7
Please retain product label and instructions for future reference
IMPORTANT:
Pre-drill before fixing screws.
Step 11
(See Pre-Assembly)
Parts needed - No. 9 QTY 1
No. 12 QTY 1
Following the same method
outlined in
Pre-Assembly
, lay
the last two boards (
No’s. 9 &
12
)
onto the assembly.
Once in position fix by
screwing through the notches
as shown in the illustration.
*Ensure that the boards are
level and flush with each
other as you lay each one.
4x70mm Screws
Pre drill
hole
70mm
screw
12
Step 12
(See Pre-Assembly)
Parts needed - No. 4 QTY 2
Place the gable tops (
No. 4
) onto the assembly. Fix
each gable into position by
screwing through the notches
as shown in the illustration.
*Ensure that the boards are
level and flush with each
other as you lay each one.
4x70mm Screws
Pre drill
hole
70mm
screw
4
4
IMPORTANT:
Pre-drill before fixing screws.
Step 13
Parts needed - No. 25 QTY 2
Place Truss A x2
(No. 25)
onto the
assembly as shown and adjust
where necessary.
*DO NOT FIX THEM TO THE
ASSEMBLY AT THIS POINT.
9
25
25
31
31
31
32
32
31
Step 14
Parts needed - No. 31 QTY 4
No. 32 QTY 2
Place the shorter finisher boards
x2
(No. 32)
onto the assembly in
the centre position as shown.
This will ensure the roof truss’
are in the correct place.
The longer finisher boards x4
(No. 31)
will go either side.
Fix the finisher boards to the
building with 2x70mm screws
per board.
12x70m Screws
Pre drill
hole
70mm