Step 18
Parts needed - No. 17 QTY 106
Place the first two roof board’s
(
No. 17
) onto the assembly on
each side, making sure the boards
are flush to the end of the roof
purlin. Once in position fix to each
purlin using 4x40mm screws.
*Ensure the roof boards meet
at the top of the apex and leave
an overhang at the bottom.
Continue adding the roof boards
along the roof, fixing each one into
position using 4x40mm screws,
making sure that each board is
interlocked, flush at the bottom &
meet at the top of the apex.
The last board on each side will
overhang: Using a staight edge
and a pencil mark out a line as
a guide.
Cut along the pencil mark and
remove the excess. Place the
cut down board’s back onto the
roof and secure into place
using 4x40mm screws per
board.
*Please Note:
This image is for illustrative
purposes and may differ from your choice in
product. Nevertheless the process of cutting
and fitting the last roof boards is the same.
416x40mm Screws
40mm
screw
Pre drill
hole
Step 19
Parts needed - No. 16 QTY 4
Ensuring the roof boards are flush
at the overhanging side and meet
at the apex, fix the eaves frames
(
No. 16
) to the underside of the roof
boards using 10x40mm screws per
eaves frame as shown in the
illustration.
*Please Note:
This image is for
illustrative purposes and may
differ from your choice in
product. Nevertheless the process
of fixing the eaves frames is the
same.
40x40mm Screws
40mm
screw
Pre drill
hole
*
Cut to fit
IMPORTANT:
Pre-drill before fixing screws.
IMPORTANT:
Pre-drill before fixing screws.
23b
17
17
a
17
b
a
b
28
17
16
16
16
16