background image

P 6

Please retain product label and instructions for future reference

             

Step 7 

(See Pre-Assembly)

Parts needed - No. 7 QTY 12   

 

 

No. 8 QTY 6

 

 

No. 9 QTY 6

 

 

No. 10 QTY 12

 

 

No. 11 QTY 6

Following the same method

outlined in 

Pre-Assembly

, lay

the next 6 boards (

No’s. 7, 8, 9, 

10 & 11

) onto the assembly

to create your second level.

*Ensure that the boards are

level and flush with each

other as you lay each one.

**Please Note: 

The short boards placed

to create the opening’s for the doors &

windows can be placed either side 

depending on your needs.

Step 10 

(See Pre-Assembly)

Parts needed - No. 7 QTY 12

 

 

No. 8 QTY 6

 

 

No. 9 QTY 6

 

 

No. 10 QTY 12  

 

 

No. 11 QTY 6

Following the same method

outlined in 

Pre-Assembly

, lay

the remaining boards (

No’s. 7, 

8, 10, 11 & 12

) onto the 

assembly to bring the board 

level to the top of the window 

and door frames.

*Ensure that the boards are

level and flush with each

other as you lay each one.

4x70mm

10 

10 

8

7

9

11

Step 8

Following the same method, place the 

assembled garage door frame 

inbetween the short boards at the 

front of the building ensuring the 

frame rests on top of the bearers.

Once in place secure the frame to

the log boards, screwing through

the frame into the boards using

10x70mm screws.

10x70mm Screws

Pre drill 

hole

70mm 

screw

Pre drill 

hole

70mm 

screw

IMPORTANT: 

Pre-drill before fixing screws.

IMPORTANT: 

Pre-drill before fixing screws.

Step 9

Once you have laid the second

level of boards onto the assembly

slide the window(

s

(No. 1) 

between the 

smaller boards and rest on to the 

longer board.

*Ensure the boards are level with

each end.

*Please note:

 This image is for

illustrative purposes and may

differ from your choice in product

(

regarding window position

).

Nevertheless the process of fitting

the window is the same.

7

10 

10 

8

7

9

11

7

IMPORTANT: 

Pre-drill before fixing screws.

Summary of Contents for 0644LOG178-V4

Page 1: ...nsit and for upto 3 months against mould To validate your guarantee and ensure longevity of the product it is ESSENTIAL the building is treated with a wood preserver within the first three months of a...

Page 2: ...Y 19 LB44 A 4200 Purlin 45x120x5808mm QTY 5 F45120 A 5808 Fascia 16x120x2237mm QTY 4 S16120 G 2237 Angled Fascia 16x120x2900mm QTY 4 S16120 2900 Eaves frame 27x44x2900mm QTY 4 F2744 2900 Roof Board 16...

Page 3: ...erence Finisher Board 44x45x1978 QTY 4 LB44RG45 B 1978 Finisher Board 44x45x1771 QTY 2 LB44RG45 C 1771 32 31 33 90mm Bolt Set x16 34 35 Felt 36 Pre assembly Please note Each board interlocks at either...

Page 4: ...1 QTY 4 Place the small angled bearers No 21 into each corner as shown in the illustration Ensure there is an equal amount of space between each frame Secure each of the frames in place using 2x70mm s...

Page 5: ...r illustrative purposes and may differ from your choice in product regarding door position Nevertheless the process of fitting the door frame is the same Please Note The short boards at the front of t...

Page 6: ...frames Ensure that the boards are level and flush with each other as you lay each one 4x70mm 10 10 8 7 9 11 Step 8 Following the same method place the assembled garage door frame inbetween the short...

Page 7: ...le into position by screwing through the notches as shown in the illustration Ensure that the boards are level and flush with each other as you lay each one 4x70mm Screws Pre drill hole 70mm screw 4 4...

Page 8: ...ure the purlins at each end by screwing through the bars into the boards ensure to pre drill to avoid the boards splitting using 6x70mm screws per purlin Please note The gable shown is for illustrativ...

Page 9: ...g down with 1x40mm screw The fix the Truss B s to the top roof purlin with 1x40mm screw as shown 8x40mm Screws Step 17 Parts needed No 27 QTY 4 Fix Truss C No 27 to Truss A screwing down at an angle w...

Page 10: ...move the excess Place the cut down board s back onto the roof and secure into place using 4x40mm screws per board Please Note This image is for illustrative purposes and may differ from your choice in...

Page 11: ...0x Felt Tacks Step 20 Parts needed No 24 QTY 8 Inside the building place a closure trim No 24 against the boarding and align with the roof as shown in the illustration Once in position fix each trim i...

Page 12: ...33 3 Step 23 Parts needed No 3 QTY 1 No 33 QTY 6 Using the screws and bolts provided attach the band part of the hinge s No 33 to the front of the garage doors No 3 Ensure to align the band with the...

Page 13: ...ded No 35 QTY 2 Using the screws provided attach the pull handles without the locking bar No 35 to the front of the garage doors Step 27 Parts needed No 22 QTY 1 No 34 QTY 1 Fix the garage door strip...

Page 14: ...uilding internally Place 2x storm braces per side fixing into place using 2x 90mm bolts per brace making sure the washer nut are tightened from the outside of the building Ensure the storm braces are...

Reviews: